Skip to main content

New bridge connection from Nigeria to Cameroon

A new bridge is being built linking Cameroon and Nigeria and spanning the Cross River where it forms the border between the two countries.
August 18, 2015 Read time: 2 mins

A new bridge is being built linking Cameroon and Nigeria and spanning the Cross River where it forms the border between the two countries. Work on the new dual carriageway bridge has been delayed but the link should be complete and ready for traffic by the end of 2015.

The 276m bridge is being built by a Chinese contractor, China Civil Engineering Construction Company, with work having commenced two years ago following the tender process in 2011. Funding is being provided by the African Development Bank (AfDB). The new structure will take the place of the single lane suspension bridge currently connecting Nigeria with Cameroon but which has insufficient capacity for the traffic needs.

The new Cross River Bridge forms part of a wider project to connect the Nigerian city of Enugu with Bamenda in Cameroon, a distance of 443km. Some 240km of the highway route runs through Nigeria, from Enugu, though Abakaliki and to the border at Ekok. The remaining 203km is in Cameroon and runs through Mfum to Mamfé and Bamenda. As well as connecting Enugu and Bamenda, this new road link will also provide better transport connections to and from the Nigerian port of Calabar into neighbouring Cameroon.

Completion of the new route will improve trade and transport between the neighbouring nations, which has been hampered by inadequate links in the past. In addition to the new cross border bridge, there is another 100m long bridge on the route that spans the Munaya River, a tributary of the Cross River, in Cameroon.

Related Content

  • East Africa drives towards road tolling
    March 18, 2016
    Road tolling is increasing in East Africa as the region’s countries expand highway networks - Shem Oirere writes. The drive towards road tolling in East Africa is gaining momentum. Uganda appears to have broken ranks with its neighbours to make huge strides in achieving progress with this innovative road financing plan. Road tolling has hitherto has been held back in East Africa for lack of political goodwill and State bureaucracies. Kenyan government officials have made announcements on planned road tollin
  • Interstate bridge collapse in Washington State
    May 24, 2013
    A section of bridge carrying Interstate 5 over the Skagit River in the US has collapsed, dumping a number of vehicles into the river, although no fatalities have been reported. The four lane highway bridge lies around 100km north of Seattle in the Pacific North Western state of Washington and provides a key link with neighbouring Canada. The collapse means that traffic between the US and Canada has been disrupted until repairs can be made or a temporary replacement put in place. There is another bridge runn
  • Colombian highway connection being built
    March 27, 2019
    Construction work is well underway for Colombia’s Autopista Mar 1 motorway project. The route is due for completion in 2022, connecting the country’s Caribbean and Pacific coasts through Medellin. The project includes construction of the Tunel de Occidente. A finance package worth US$713 million in the shape of loans from eight banks is helping fund the project. Work is also ongoing for the Conexio Norte routelinking Remedios with Caucasia. This project should be complete by 2021. Meanwhile the Via del Nu
  • New bridges planned for Vietnam
    July 7, 2020
    New bridge projects are being planned for Vietnam.