Skip to main content

New bridge for China’s Hainan Province

Construction work is now commencing for a major new bridge project in China. The bridge is being built in Hainan Province and will measure close to 5.7km long when complete. It will link the mainland of Hainan Province with Ruyi Islet. The project is being designed primarily to handle road traffic as well as a tram link, while it will also carry utilities including water, gas, electricity and fibre optic cabling. Lead contractor for the project is China Railway 18th Bureau Group's 2nd Engineering Company. T
February 23, 2017 Read time: 2 mins
Construction work is now commencing for a major new bridge project in China. The bridge is being built in Hainan Province and will measure close to 5.7km long when complete. It will link the mainland of Hainan Province with Ruyi Islet. The project is being designed primarily to handle road traffic as well as a tram link, while it will also carry utilities including water, gas, electricity and fibre optic cabling. Lead contractor for the project is China Railway 18th Bureau Group's 2nd Engineering Company. The bridge will be 27.5m wide and will run from the city of Haikou to the artificial islet, itself currently under construction. The project faces engineering challenges as the water underneath ranges in depths from 10-15m with a strong tidal flow, while the area is prone to high winds and fog. Because of the location the bridge is being designed to cope with typhoons as well as large eathquakes.

Related Content

  • Bridge design using flow modelling techniques
    February 17, 2012
    SBG has set numerous engineering precedents with its hugely innovative Jamarat Bridge project in Saudi Arabia
  • Brisbane's highway of distinction
    August 2, 2012
    A massive AU$2 billion update of the Gateway Motorway in Queensland is underway to improve an infrastructure stretched by population boom. Report and photographs by Adrian Greeman Just 20 years after the Australian city of Brisbane built its Gateway Motorway with a high slim signature bridge dominating the river skyline, the road is being completely revamped. Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels; the north is getting a completely
  • Bolivia’s new highway
    October 10, 2017
    Bolivia’s new highway will provide better access into mountain areas – Mauro Nogarin writes At the beginning of 2015, work began on the construction and paving for the Tupiza - Atocha - Uyuni highway project. The route is located in Bolivia’s Potosí department: it is 189m in length and forms part of the Southwest Basic Road Network (RVF) of Bolivia. The completion of this important route is requiring funding worth US$150 million, of which 72% is being delivered through loans from the European Investment
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.