Skip to main content

New bridge for China

A new bridge will be built in China’s Hubei Province
By MJ Woof October 28, 2020 Read time: 1 min
An important new bridge project is being carried out to span the Yangtse River in China – image © Ticoyan85 | Dreamstime.com
Work is now going ahead for the construction of the new Yanji Yangtze River Bridge link in China’s Hubei Province. This new suspension bridge will feature a novel double deck design and provide the second link between Ezhou City and Huanggang City.

This will be China’s second longest suspension bridge when complete, featuring a main span of some 1.65km. The project is being carried out by two Chinese contractors, Second Harbor Engineering Company and China Railway Major Bridge Engineering Group.

The work is costing US$1.83 billion, with the upper deck carrying six lanes and featuring a design speed of up to 100km/h, while the lower deck has four lanes and a design speed of up to 80km/h.

Related Content

  • Cambodian connection – construction completion
    May 13, 2022
    Completion of the contract to construct a new Cambodian connection is coming soon.
  • Vietnam expressway deals
    June 30, 2020
    Key Vietnam expressway deals are now underway.
  • Major Europe-Asia bridge connection in Turkey
    July 1, 2014
    The 3rd Bosporus Bridge and the Northern Marmara Motorway will improve transport links between Europe and Asia and cut chronic congestion in Istanbul, Turkey’s largest city - Mike Woof reports Work is now well underway on the 3rd Bosporus Bridge and the Northern Marmara Motorway, providing a new link for Turkish city Istanbul and the region as a whole. This enormous bridge and highway project is breaking several records for Turkey in terms of scale, as well as setting a number of international records for e
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.