Skip to main content

New bridge being completed in Colombia

A key bridge link is due for completion in Colombia shortly. The new Moravia bridge forms part of the Santa Madre Laura road project and should be complete in April 2016. The bridge is over 500m long and has cost some US$46.8 million to build. The work is being carried out by construction consortium Bermejal. Once open to traffic the bridge will help to reduce traffic on the existing Barranquilla and Mico bridges by providing an alternative route to west Medellin.
January 19, 2016 Read time: 1 min
A key bridge link is due for completion in Colombia shortly. The new Moravia bridge forms part of the Santa Madre Laura road project and should be complete in April 2016. The bridge is over 500m long and has cost some US$46.8 million to build. The work is being carried out by construction consortium Bermejal. Once open to traffic the bridge will help to reduce traffic on the existing Barranquilla and Mico bridges by providing an alternative route to west Medellin.

Related Content

  • Second phase for Manila road project
    December 27, 2021
    The second phase for a Manila road project is underway.
  • New Turkey tunnels for Istanbul and Izmir
    May 31, 2017
    New tunnel connections are to be built in Istanbul and Izmir, along with a new bridge in Izmir. Work is due to start shortly on the Grand Istanbul Tunnel Project. This will be a three level tunnel and should help lower congestion in Istanbul, which suffers amongst the worst traffic jams of any city in the world.
  • Novel concrete surfacing option used in Colorado
    December 10, 2015
    Proven polyester bridge deck surfacing technology is now being used more widely – Mike Woof writes. The benefits of using polymer concrete bridge deck overlays are well known and this technology is becoming widely used in the US. The system can improve protection for bridge surfaces and help extend the life of a bridge deck, as well as increasing skid resistance. In the last 25 years the use of these overlays has increased significantly in the US. These perform best when installed on bridge decks that are i
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.