Skip to main content

New Brazil road tenders opening

Two major road tenders are opening for bids in Santa Catarina in Brazil during 2019. These will be for the BR-101/SC highway and BR-470/SC highway. The latter will involve a connection to an airport and is costing US$143 million to upgrade and widen the existing route.
January 29, 2019 Read time: 1 min

Two major road tenders are opening for bids in Santa Catarina in Brazil during 2019. These will be for the BR-101/SC highway and BR-470/SC highway. The latter will involve a connection to an airport and is costing US$143 million to upgrade and widen the existing route.

Related Content

  • ANTT handles Brazil highway tender
    April 8, 2014
    The tender process is underway in Brazil for the BR-153 Federal Highway, a project estimated to be worth US$1.89 billion. The BR-153 Belem Brasilia Highway route measures 625km long, connecting Anapolis, in Goias state, and Alianca do Tocantins, in Tocantins State. The tender is being handled by Brazil’s Land transport agency Agencia Nacional de Transportes Terrestres (ANTT) and the auction will take place on 23rd May 2014. The work involves widening the road within five years of the concession being grante
  • New Brazil road tender process due
    June 6, 2019
    The tender process for Brazil’s 364/365 highway will commence in mid-September 2019. The 437km route connects Jatai, Ituiutaba and Uberlandia in Minas Gerais State. The concession deal will be for 30 years and investment in the road is expected to be worth US$1.22 billion. The tender will be awarded to the firm offering the lowest toll rate. The national land transport agency, ANTT, is overseeing the tender process.
  • Tender opening for Oman road project
    May 8, 2019
    The tender process is opening in Oman for a major road widening project.
  • Chile road project, tender process opening
    April 17, 2019
    The tender process is opening for an important road project for Chile. The bidding process for the 142km road upgrade project is opening at the end of May 2019, with construction expected to start in 2021 once the necessary permissions process and financing package has been finalised. The work is for the improvement of the Camino de la Fruta road link, Chile’s Ruta 66. This road runs from San Antonio on the coast and connects with the country’s key north-south link, Ruta 5, at Pelequén to the north of San F