Skip to main content

New Australia route in Victoria

Work is set to commence on a new bypass in Australia’s Victoria State in 2019, with the work planned for completion in 2022. The new Mordialloc Bypass will run from the existing Dingley Bypass to the Mornington Peninsula Freeway. The project is expected to cost US$226.3 million (A$300 million).
May 5, 2017 Read time: 1 min

Work is set to commence on a new bypass in Australia’s Victoria State in 2019, with the work planned for completion in 2022. The new Mordialloc Bypass will run from the existing Dingley Bypass to the Mornington Peninsula Freeway. The project is expected to cost US$226.3 million (A$300 million).

Related Content

  • Taiwan road construction project
    April 15, 2020
    A new road construction project is planned for Taiwan.
  • Malaysia mega tunnel project
    March 9, 2016
    A massive tunnel project is set to commence in Malaysia shortly. This impressive project includes the construction of three expressways and an undersea tunnel and is intended to link Penang island to the mainland. The work is set to commence on the 15th June 2016, with the first stage being the construction of the Air Itam-Tun Dr Lim Chong Eu Expressway bypass. The main contractor for the project is Consortium Zenith BUCG (CZBUCG) and its partner for the undersea tunnel is China Railway Construction. The pr
  • Construction commencing on Pennsylvania highway stretch
    November 16, 2018
    Construction is commencing on a 4.4km stretch of the Southern Beltway in the US state of Pennsylvania. This forms part of a project for a 21km section of toll road, with its completion expected in 2022. The entire project is for the extension of the Southern Beltway from the Turnpike 576 terminus at US Route 22 in Robinson Township, to a new interchange with Interstate 79 at the Allegheny-Washington County line. The work is needed to boost capacity and improve transport, while cutting congestion for drivers
  • Two key Mexican road projects underway
    November 7, 2018
    Work is currently underway on two key road projects in Mexico’s Puebla State, with completion expected either at the end of 2018 or in early 2019. The projects are worth a total of US$136.5 million and are for the Siglo XXI highway and La Galarza-Amatitlanes bypass. Puebla State has benefited heavily from spending on its road infrastructure due to a substantial budget provided by the Mexican Secretariat of Communications and Transport (SCT). The aim of the road development work in the state has been to boos