Skip to main content

New airport road interchange in China being built

Construction work is now underway on the interchange for the second highway connecting to China’s Guangzhou Baiyun International Airport. The new highway is around 21.4km long and connects Huadu district with Tianhe district. The route features 15 bridges and has a design speed of 100km/h. The new link will improve connections between the airport and Guangzhou City and the work is costing US$1.32 billion. Located in South China, Guangzhou City lies comparatively close geographically to Hong Kong and develop
January 5, 2016 Read time: 1 min
Construction work is now underway on the interchange for the second highway connecting to China’s Guangzhou Baiyun International Airport. The new highway is around 21.4km long and connects Huadu district with Tianhe district. The route features 15 bridges and has a design speed of 100km/h. The new link will improve connections between the airport and Guangzhou City and the work is costing US$1.32 billion. Located in South China, Guangzhou City lies comparatively close geographically to Hong Kong and developing the links to the airport will be of key benefit to the region.

Related Content

  • Chinese investment sought for Cameroon roads
    September 19, 2024
    Chinese investment is being sought for Cameroon’s road improvements.
  • More Saudi airport capacity
    October 12, 2012
    A major expansion programme is underway at King Abdulaziz International Airport in Jeddah, Saudi Arabia. The work started in the third quarter of 2006 and is due for completion in 2015, with the construction activity being carried out in three main stages. Once the work is complete the airport will be able to handle up to 80 million passengers/ year, compared with 13 million/year before construction commenced. The project also includes three new terminal buildings and a high-speed rail link, as well as airf
  • New bridge for Drammen, Norway
    January 19, 2021
    A new bridge will be built in Drammen, Norway.
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.