Skip to main content

New 125km road for Spain’s Meseta area

A new €1.2 billion, 125km road is earmarked for the Meseta (inner plateau) area of Spain. The new A-76 highway will run between Ourense, Monforte and Ponferrada. Those behind the project say it will not affect protected geographic areas. The new highway will join the recently opened Autovia del Cantabrico (A-8) which took ten years to complete.
February 19, 2014 Read time: 1 min
A new €1.2 billion, 125km road is earmarked for the Meseta (inner plateau) area of Spain.

The new A-76 highway will run between Ourense, Monforte and Ponferrada.  Those behind the project say it will not affect protected geographic areas. The new highway will join the recently opened Autovia del Cantabrico (A-8) which took ten years to complete.

Related Content

  • The EU is investing in alternative fuels for Spain
    January 11, 2013
    Alternative fuels used for road transport in Spain are to benefit from EU support. Under the TEN-T Programme the EU will co-finance a study to determine the required steps to integrate Liquefied Natural Gas (LNG) refuelling technology in Spain. The €2 million provided by the EU will also be used to demonstrate the potential of LNG as a more environmentally friendly and cost effective transport fuel for heavy goods vehicles running on Spain’s sections of the TEN-T road network. The project was selected for f
  • Latest data shows Spain’s road crash rate falling
    November 26, 2012
    The latest official statistics from Spain reveal and improvement in road safety, with a reduction in the number of those killed or seriously injured on the country’s roads. In 2011 there were 2,060 deaths caused by crashes on Spanish roads in 2011, a 13% drop from the previous year. These figures include those people dying within 30 days of a crash
  • Approval given for expressway in China’s Anhui Province
    March 10, 2014
    Official approval has been given to the feasibility report for the Chuzhou-Huainan Expressway project in China’s Anhui province. Construction of the US$1.35 billion expressway will be carried out during 2014 and the projects is due for be completion within 3 years. The 125km route will feature four lanes in either direction and will have a speed limit of 120km/h. The expressway project includes seven interchanges.
  • New study suggests Fehmarn Belt payback close to 50 years
    October 9, 2015
    A study by Danish consultant Hans Schjær-Jacobsen has shown that the payback period for the proposed Fehmarn Belt Fixed Link tunnel project between Denmark and Germany will be close to 50 years. This is a decade longer than estimated by the developers of the project which focusses on a 17km immersed tunnel, the study noted. The Fehmarn Belt Fixed Link will connect the German island of Fehmarn with the Danish island of Lolland. The 17km tunnel, including two railway tunnels, two motorway tunnels and an