Skip to main content

Netherlands: Velsertunnel to be closed for nine months

The 60-year-old road and rail Velsertunnel in the Netherlands will be closed from now until the end of the year for major renovations. Improvements to the Velsertunnel beneath the North Sea Canal are scheduled for the road sections only, according to the Rijkswaterstaat, the Dutch government’s Ministry of Infrastructure and the Environment, and the consortium doing the work. Rijkswaterstaat awarded a design/build/maintain contract in 2014 to Hyacint, a consortium of Besix, Dura Vermeer, and Spie, supp
April 19, 2016 Read time: 2 mins
The 60-year-old road and rail Velsertunnel in the Netherlands will be closed from now until the end of the year for major renovations.

Improvements to the Velsertunnel beneath the North Sea Canal are scheduled for the road sections only, according to the Rijkswaterstaat, the Dutch government’s Ministry of Infrastructure and the Environment, and the consortium doing the work.

Rijkswaterstaat awarded a design/build/maintain contract in 2014 to Hyacint, a consortium of Besix, Dura Vermeer, and Spie, supported by iNFRANEA. Last year the consortium completed a 3-D BIM model (Building Information Modelling) of the tunnel and of the proposed work to be done. %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Click here Visit bimontherocks.com website false http://bimontherocks.com/bim-helps-renovate-aging-tunnel/ false false%> for the presentation.

The renovated tunnel will have a 12cm higher clearance profile for trucks, new asphalt and modern technical installations, such as CCTV, fire protection equipment, traffic control systems and ventilation. Escape routes will also be fully updated.

Under the contract, the original and now iconic ventilation towers reaching skyward atop the main ventilation building must remain intact. The unusual-looking towers were listed as a national heritage site in 2014.

Around 65,000 vehicles a day use the tunnel and traffic will be diverted to the Wijkertunnel, a toll tunnel.

The Wijkertunnel is a 21-year old structure that is the first public-private partnership in the Netherlands. Three-quarters of the total €272 million construction cost was put up by a consortium of banks and insurance companies, including ING and Commerzbank. The contract was for 30 years.

Related Content

  • Cimolai Technology’s customised lifting quality
    January 6, 2017
    Cimolai Technology’s special lifting equipment includes mobile straddle transporters and flat-bed trolleys on tyres, rail gantry cranes, cantilever lifting devices and launching gantries for bridge and viaducts construction. The company is renowned for customised solutions and guarantees worldwide assembly and after-sale service.
  • Cimolai Technology’s customised lifting quality
    March 27, 2013
    Cimolai Technology’s special lifting equipment includes mobile straddle transporters and flat-bed trolleys on tyres, rail gantry cranes, cantilever lifting devices and launching gantries for bridge and viaducts construction. The company is renowned for customised solutions and guarantees worldwide assembly and after-sale service.
  • Copy of LeeBoy expansion strategy targets emerging markets
    October 16, 2014
    During the recent Conexpo event in Las Vegas, Kelly Majeskie, President of The LeeBoy Group, spoke about his expansion plans for the business “We’ve been working on a couple strategies for LeeBoy” said Majeskie, “an overseas growth strategy and a more focused approach to the US market. Like most businesses we saw a major downturn when the US housing market took the big hit in 2008/9.
  • Mecalac 10MCR launched at INTERMAT
    April 13, 2012
    Following the success of its 8MCR high-speed compact excavator, Mecalac has developed a larger, heavier model, called the 10MCR. Like the smaller machine introduced in 2009, this new model combines the speed and manoeuvrability of a skid steer loader with the functionality of a midi excavator. Weighing in at nine tones and using a 75kW turbocharged diesel engine, the new model retains Mecalac’s MCR concept and uses a triangular track frame profile, which affords fast travel speeds in both directions usin