Skip to main content

Netherlands: Velsertunnel to be closed for nine months

The 60-year-old road and rail Velsertunnel in the Netherlands will be closed from now until the end of the year for major renovations. Improvements to the Velsertunnel beneath the North Sea Canal are scheduled for the road sections only, according to the Rijkswaterstaat, the Dutch government’s Ministry of Infrastructure and the Environment, and the consortium doing the work. Rijkswaterstaat awarded a design/build/maintain contract in 2014 to Hyacint, a consortium of Besix, Dura Vermeer, and Spie, supp
April 19, 2016 Read time: 2 mins
The 60-year-old road and rail Velsertunnel in the Netherlands will be closed from now until the end of the year for major renovations.

Improvements to the Velsertunnel beneath the North Sea Canal are scheduled for the road sections only, according to the Rijkswaterstaat, the Dutch government’s Ministry of Infrastructure and the Environment, and the consortium doing the work.

Rijkswaterstaat awarded a design/build/maintain contract in 2014 to Hyacint, a consortium of Besix, Dura Vermeer, and Spie, supported by iNFRANEA. Last year the consortium completed a 3-D BIM model (Building Information Modelling) of the tunnel and of the proposed work to be done. %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Click here Visit bimontherocks.com website false http://bimontherocks.com/bim-helps-renovate-aging-tunnel/ false false%> for the presentation.

The renovated tunnel will have a 12cm higher clearance profile for trucks, new asphalt and modern technical installations, such as CCTV, fire protection equipment, traffic control systems and ventilation. Escape routes will also be fully updated.

Under the contract, the original and now iconic ventilation towers reaching skyward atop the main ventilation building must remain intact. The unusual-looking towers were listed as a national heritage site in 2014.

Around 65,000 vehicles a day use the tunnel and traffic will be diverted to the Wijkertunnel, a toll tunnel.

The Wijkertunnel is a 21-year old structure that is the first public-private partnership in the Netherlands. Three-quarters of the total €272 million construction cost was put up by a consortium of banks and insurance companies, including ING and Commerzbank. The contract was for 30 years.

Related Content

  • European police group TISPOL committed to helping cut road deaths
    April 2, 2015
    In its latest three-year strategic plan, the European Traffic Police Network has reaffirmed its commitment to the European Union’s road death reduction target of 50% by 2020. World Highways reported last month that road deaths fell by just 1% in the EU in 2014, according to data released by the European Commission. There were 25,700 road deaths across all 28 Member States of the EU. The European Commissioner of Transport, Violeta Bulc said at the time that the statistics give some cause for concern. S
  • Pothole pique drives UK man into action
    December 12, 2014
    Potholes are the scourge of commuters and the source of hours of complaining around the office water cooler. But some people do more than complain; they take action that gets results, such as happened recently in the United Kingdom.
  • VIDEO: Concrete paving - you’ve come a long way, baby!
    July 14, 2016
    It’s 1948. The grand scheme of creating an Interstate Highway system in the US is still barely a twinkle in President Dwight Eisenhower’s military eye. Highway construction improved greatly in the late 1950s and early 1960s as the American contractors became more mechanized and therefore efficient at laying roads faster and of better quality. But how did they build a road back then in 1948? Thanks to Encyclopaedia Britannica Films, we have a movie of just how a concrete highway was created. The constr
  • Sunderland’s sliding bridge slips across the Wear
    October 26, 2016
    Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation next year likely. The project to build the New Wear Crossing is now half way through with the first half of the steel deck bridge poised mid-river. Completion of the bridge is expected in the spring of 2018. This month, hydraulic jack