Skip to main content

Netherlands road widening deal for Fugro

A road widening contract in the Netherlands is being handled by Fugro.
By MJ Woof April 22, 2020 Read time: 1 min
Plan view of A9 highway near Amstelveen after successful upgrade and expansion – image © courtesy of Fugro

Fugro will work on a three-year contract on the widening of the A9 highway in the Netherlands. The firm’s contract covers geotechnical and design work for the A9 highway upgrade and expansion project.

In addition to geotechnical ground investigation work, Fugro will provide geotechnical design for all civil structures. This includes ground-retaining walls and earthworks for widening the highway. The scope of work includes preparation of a 3D ground model, which will facilitate more efficient scenario analysis and integration with the project’s building information model (BIM).

The A9 project is for the widening of 10km of existing highway between the Holendrecht and Badhoevedorp junctions. It includes a deep cutting nearly 2km long. This section of the A9 passes through a densely populated area between Schiphol and Amsterdam, which presents additional challenges for the acquisition of Geo-data along this busy stretch of road.

The ground investigation itself will comprise more than 1,500 cone penetration tests, 90 deep soil borings, 150 hand auger borings, and laboratory tests on selected samples. Fugro will compile these acquired Geo-data and other deliverables into a single integrated geographic information system (GIS) for streamlined project management and analysis.

For more information on companies in this article

Related Content

  • Connectivity is key for contractors
    November 8, 2022
    Michigan Department of Transportation (MDOT) has planned its US$210 million I-69 Rebuild Project in Eaton and Calhoun Counties, work that will improve journeys for drivers in the area
  • Washington DC’s historic bridge replacement project
    June 11, 2019
    The project to replace a historic bridge in US capital Washington DC is providing major challenges for its builders - Mike Woof writes
  • Regensburg road revamp will widen key stretch
    February 14, 2018
    Work is now commencing on widening a stretch of the A3 Autobahn where it passes through the Bavarian city of Regensburg. The 15km section of the A3 will be widened from its present two lanes to three lanes. The project is costing €270 million and will be carried out on the section from the junction between the A3 and B8 at Rosenhof to the east of Regensburg and running 15km westwards, past the junction with the A93 Autobahn route that connects with the A9 and Munich to the south. This work is needed as the
  • Regensburg road revamp will widen key stretch
    February 14, 2018
    Work is now commencing on widening a stretch of the A3 Autobahn where it passes through the Bavarian city of Regensburg. The 15km section of the A3 will be widened from its present two lanes to three lanes. The project is costing €270 million and will be carried out on the section from the junction between the A3 and B8 at Rosenhof to the east of Regensburg and running 15km westwards, past the junction with the A93 Autobahn route that connects with the A9 and Munich to the south. This work is needed as the