Skip to main content

Netherlands reviews tunnel safety

Questions are being asked in the Netherlands following the news that twin road tunnels planned to form part of the new 7km stretch of the A4 highway between Delft and Schiedam will not meet EU safety regulations. The Dutch Commission for Tunnel Safety says that the link, which has a total of eight lanes, will not meet the EU regulations, which were toughened after a series of tunnel disasters in Austria and Switzerland. Instead the commission wants four tunnels to be built, each for two lanes of traffic,
May 15, 2012 Read time: 2 mins
Questions are being asked in the Netherlands following the news that twin road tunnels planned to form part of the new 7km stretch of the A4 highway between Delft and Schiedam will not meet EU safety regulations.

The Dutch Commission for Tunnel Safety says that the link, which has a total of eight lanes, will not meet the EU regulations, which were toughened after a series of tunnel disasters in Austria and Switzerland.

Instead the commission wants four tunnels to be built, each for two lanes of traffic, as this will allow travellers to have better escape routes in an emergency.

But the Dutch department for infrastructure maintenance, Rijkswaterstaat, says that this will be considerably more expensive to build while there is also a limitation on space. In addition Rijkswaterstaat believes that four tunnels would suffer more traffic congestion. The safety regulations are now being reviewed before the approval to build the twin tunnels can be given.

In a further development additional emergency lanes have been requested for other sections of the A4 highway.
Meanwhile, a huge investment in highway construction during 2011 will see the Netherlands building 210km of new sections including additional lanes on the A1, A9, A27 and A28 highways as well as an extension to the A15 between Maasvlakte and Vaanplein. There are also plans to widen the highways between Schiphol, Amsterdam and Almere.

By the end of 2010 the country will have carried out some 325km of highway work, the most carried out in the country over a 12 month period.

Related Content

  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • El Sillar – Bolivia’s challenging road project
    February 6, 2020
    Construction of Bolivia’s El Sillar highway, the country’s most complicated road project – Mauro Nogarin reports
  • Copy of New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Building New zealand's landmark tunnel
    February 15, 2012
    A landmark tunnelling project is commencing in New Zealand - Kristina Smith reports. New Zealand is preparing to embark on its biggest transport project ever. In August it announced that it had selected its preferred bidder for the NZ$1.4 billion Waterview Connection in Auckland, 5km of new motorway connecting highways to the North and South of the city.