Skip to main content

Netherlands highway widening and upgrade project

A major highway widening project is now planned for the M20 route in the Netherland. A budget of €124 million has been set for the work, which will see the stretch between Nieuwekerk aan den IJssel and Gouda being widened. This section features two lanes in either direction at present but the work will see the stretch featuring three lanes in either direction. The work will help reduce congestion and delays for drivers, improving journey times at peak periods.
April 4, 2019 Read time: 1 min

A major highway widening project is now planned for the M20 route in the Netherland. A budget of €124 million has been set for the work, which will see the stretch between Nieuwekerk aan den IJssel and Gouda being widened. This section features two lanes in either direction at present but the work will see the stretch featuring three lanes in either direction. The work will help reduce congestion and delays for drivers, improving journey times at peak periods.

Related Content

  • India’s US$2.2 billion Mumbai Trans Harbour Link opens
    January 12, 2024
    India’s US$2.2 billion Mumbai Trans Harbour Link is being opened to traffic.
  • Serbia upgrading infrastructure
    May 2, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget. Wh
  • Serbia upgrading infrastructure
    March 16, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci.
  • $78 million Granite contract in CA
    February 17, 2025
    Granite construction is working on a $78 million contract in CA.