Skip to main content

Nepal's new bridge link

Construction work is underway in Nepal on one of the biggest box-girder bridges ever built in the country. The bridge is located in Mid West Nepal and measures just over 1km long.
February 13, 2012 Read time: 2 mins
Construction work is underway in Nepal on one of the biggest box-girder bridges ever built in the country. The bridge is located in Mid West Nepal and measures just over 1km long. This pre-stressed box girder bridge will carry two lanes of traffic and is 7.5m wide, with a 0.6m wide footpath on either side. It is expected to take five years to build and will replace a temporary pontoon bridge over the river, which has been installed during the dry season and used in the monsoon season. The new bridge crosses the Karnali River and is in Gulariya, around 25km west from the district headquarters of Bardiya, near the Indian border. Meanwhile work is also going ahead on Nepal's 1,776km mid hill highway project.The route will run through the hilly region connecting East and West Nepal. It will connect 25 of the country's 75 districts and a budget of US$16.8 million has been allocated for the work being carried out over the next three months. A further $23.6 million will be allocated for the next financial year. The two lane highway will feature an asphalt surface and is expected to take four years to complete. Funds have also been set aside for construction of the bridges that will form part of the highway.

Related Content

  • New Angolan bridge offers improved connectivity
    September 30, 2013
    Drivers in Angola are benefiting from a bridge that spans the Catumbela River, taking the place of an old structure that had proven not fit for purpose. The US$35 million cable stayed bridge is located in the highway between Benguela and Lobito, around 7km from Angola’s Atlantic coast and is one of a series of new infrastructure developments in the country. Angola suffered a long period of war that impacted on its people and infrastructure. The war resulted in severe damage to the country’s road system alon
  • British Columbia awards Quartz Bridge deal
    March 22, 2021
    The Canadian province calls time on the old Quartz Creek Bridge.
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of
  • Serbia’s pan-European Corridor X is in the slow lane
    October 23, 2017
    It’s been slow progress on Serbia’s Corridor X project. Gordon Feller reports. Back in the early 2000’s, the European Union undertook an ambitious programme to link the main cities of its south-eastern region. This involved connecting five key seaports – the Greek cities of Patras, Igoumenitsa, Piraeus and Thessaloniki as well as Romania’s Black Sea city of Constanta. Initially the plan involved two motorways across Greece. The first was a new 780km route including a branch to Ormenio on Greece’s north-eas