Skip to main content

Nepal's new bridge link

Construction work is underway in Nepal on one of the biggest box-girder bridges ever built in the country. The bridge is located in Mid West Nepal and measures just over 1km long.
February 13, 2012 Read time: 2 mins
Construction work is underway in Nepal on one of the biggest box-girder bridges ever built in the country. The bridge is located in Mid West Nepal and measures just over 1km long. This pre-stressed box girder bridge will carry two lanes of traffic and is 7.5m wide, with a 0.6m wide footpath on either side. It is expected to take five years to build and will replace a temporary pontoon bridge over the river, which has been installed during the dry season and used in the monsoon season. The new bridge crosses the Karnali River and is in Gulariya, around 25km west from the district headquarters of Bardiya, near the Indian border. Meanwhile work is also going ahead on Nepal's 1,776km mid hill highway project.The route will run through the hilly region connecting East and West Nepal. It will connect 25 of the country's 75 districts and a budget of US$16.8 million has been allocated for the work being carried out over the next three months. A further $23.6 million will be allocated for the next financial year. The two lane highway will feature an asphalt surface and is expected to take four years to complete. Funds have also been set aside for construction of the bridges that will form part of the highway.

Related Content

  • Times they are a changing
    July 23, 2012
    Construction in China still appears to be on course for growth even with the gloomy economic outlook, as it enjoys "a strong budgets position." Patrick Smith reports One thing is certain in the current global economic climate: nothing is certain. And while China has not been unaffected by the economic events of recent months it has, according to Robert Zoellinck, president of the World Bank, a very strong current account and budgetary position. For some years, the nation has enjoyed double digit growth (the
  • Athabasca’s Hwy 813 bridge to be replaced
    May 16, 2022
    The new bridge over the Athabasca River in the Canadian province of Alberta will include two 3.7m-wide lanes with 1.8m-wide shoulders on either side as well as a pedestrian sidewalk.
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • New Russian highway projects have been proposed
    October 29, 2018
    A proposal has been made to extend a key stretch of Russia’s high speed highway network. The highway connecting Moscow to Kazan would be upgraded and also extended in a bid to improve transport and cut journey times. A new highway section would run from Kazan, in the Volga Region, to Yekaterinburg, in the Urals, with planning already underway. The project also calls for a new highway running from Kazan to Samara to the south. This route will bypass Togliatta and will include the construction of a new bridg