Skip to main content

Nepal's new bridge link

Construction work is underway in Nepal on one of the biggest box-girder bridges ever built in the country. The bridge is located in Mid West Nepal and measures just over 1km long.
February 13, 2012 Read time: 2 mins
Construction work is underway in Nepal on one of the biggest box-girder bridges ever built in the country. The bridge is located in Mid West Nepal and measures just over 1km long. This pre-stressed box girder bridge will carry two lanes of traffic and is 7.5m wide, with a 0.6m wide footpath on either side. It is expected to take five years to build and will replace a temporary pontoon bridge over the river, which has been installed during the dry season and used in the monsoon season. The new bridge crosses the Karnali River and is in Gulariya, around 25km west from the district headquarters of Bardiya, near the Indian border. Meanwhile work is also going ahead on Nepal's 1,776km mid hill highway project.The route will run through the hilly region connecting East and West Nepal. It will connect 25 of the country's 75 districts and a budget of US$16.8 million has been allocated for the work being carried out over the next three months. A further $23.6 million will be allocated for the next financial year. The two lane highway will feature an asphalt surface and is expected to take four years to complete. Funds have also been set aside for construction of the bridges that will form part of the highway.

Related Content

  • Romania eyes new Danube River bridge
    August 20, 2024
    The announcement by Romania’s minister for transport, Sorin Grindeanu, comes as the Friendship Bridge, connecting Giurgiu in Romania and Ruse in Bulgaria, is closed for repairs.
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo