Skip to main content

Nepal's new bridge link

Construction work is underway in Nepal on one of the biggest box-girder bridges ever built in the country. The bridge is located in Mid West Nepal and measures just over 1km long.
February 13, 2012 Read time: 2 mins
Construction work is underway in Nepal on one of the biggest box-girder bridges ever built in the country. The bridge is located in Mid West Nepal and measures just over 1km long. This pre-stressed box girder bridge will carry two lanes of traffic and is 7.5m wide, with a 0.6m wide footpath on either side. It is expected to take five years to build and will replace a temporary pontoon bridge over the river, which has been installed during the dry season and used in the monsoon season. The new bridge crosses the Karnali River and is in Gulariya, around 25km west from the district headquarters of Bardiya, near the Indian border. Meanwhile work is also going ahead on Nepal's 1,776km mid hill highway project.The route will run through the hilly region connecting East and West Nepal. It will connect 25 of the country's 75 districts and a budget of US$16.8 million has been allocated for the work being carried out over the next three months. A further $23.6 million will be allocated for the next financial year. The two lane highway will feature an asphalt surface and is expected to take four years to complete. Funds have also been set aside for construction of the bridges that will form part of the highway.

Related Content

  • New bridge planned for Kenya’s port of Mombasa
    December 14, 2017
    Planning is being carried out for the new Mombasa Gate Bridge project, which is expected to cost close to US$778 million. The bridge will connect Mombasa Island with the South Coast, replacing a ferry operation, which first began operation in 1937. The feasibility study for the 1.4km bridge is now complete and construction of the link is expected to take 36 months to complete.
  • Another bridge over the River Drina
    October 29, 2020
    Cost of the two-lane bridge between Bosnia and Serbia is reportedly around €13 million.
  • Roadtec machines rebuild key highway in Texas
    December 16, 2013
    In the middle of central Texas lies Blanco County, which is in the state’s Hill Country. West of Austin and north of San Antonio, the county is traversed by the Blanco River and the Pedernales River, and two major highways, US Highway 290 and US Highway 281. Because of the proximity to two major cities, the highways carry heavy traffic volumes and US 281 in particular was in need of repair.
  • Doka formwork rises above the Orinoco River in Venezuela
    July 8, 2016
    Taking a road and rail link across one of the biggest rivers in South America, together with its swamps and flood-plain, called for a new crossing of truly superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River, at Caicara del Orinoco, in Venezuela took shape with a formwork solution and automatic climbing technology from Doka. The bridge has an overall length of just over 11km and the main bridge is nearly 2.3km long with the roadway 55m above the river. The two ident