Skip to main content

Nepal's new bridge link

Construction work is underway in Nepal on one of the biggest box-girder bridges ever built in the country. The bridge is located in Mid West Nepal and measures just over 1km long.
February 13, 2012 Read time: 2 mins
Construction work is underway in Nepal on one of the biggest box-girder bridges ever built in the country. The bridge is located in Mid West Nepal and measures just over 1km long. This pre-stressed box girder bridge will carry two lanes of traffic and is 7.5m wide, with a 0.6m wide footpath on either side. It is expected to take five years to build and will replace a temporary pontoon bridge over the river, which has been installed during the dry season and used in the monsoon season. The new bridge crosses the Karnali River and is in Gulariya, around 25km west from the district headquarters of Bardiya, near the Indian border. Meanwhile work is also going ahead on Nepal's 1,776km mid hill highway project.The route will run through the hilly region connecting East and West Nepal. It will connect 25 of the country's 75 districts and a budget of US$16.8 million has been allocated for the work being carried out over the next three months. A further $23.6 million will be allocated for the next financial year. The two lane highway will feature an asphalt surface and is expected to take four years to complete. Funds have also been set aside for construction of the bridges that will form part of the highway.

Related Content

  • Work on St Petersburg bridge project
    June 20, 2016
    Contractor ICA Construction used two Aquajet robotic hydrodemolition machines at the top of a 120m-high bridge pylon located in the city of St Petersburg. The two Aquajet robotic water cutters were used to remove surplus concrete from around the inner steel structure of the bridge pylon. This link spans the River Neva and forms part of the Western High-Speed Diameter (WHSD) route in St Petersburg. The WHSD is a highly important route for the region and will provide a key connection between the Scandinavi
  • New bridge to span Okavango River in Botswana
    October 17, 2016
    A new bridge is planned that will span the Okavango River in northern Botswana. The bridge will feature a cable-stayed structure and will be 1.2km long in all, with a 400m central section. The project also includes the construction of 3km of roads to connect the new bridge to existing road infrastructure, as well as installing necessary lighting and drainage systems. The project is expected to cost in excess of US$93 million and take three years to complete.
  • Concern over the state of US bridges
    April 1, 2019
    Bridge condition is a serious concern in the US, according to a new report from American Road & Transportation Builders Association (ARTBA).
  • PERI fills gap in Greek market
    February 19, 2013
    A team of Greek and German PERI engineers have developed a comprehensive formwork and scaffolding solution for the T4 bridge on the A7 motorway in Greece. The 160km long A7 connects Kalamata in the south to Corinth in the northwest of the Peloponnese peninsula. On one stretch of the motorway a 390m long arched bridge – known as T4 – is being used to close the gap between Paradisia and Tsakona. Set for completion in early 2014, two-thirds of the 22m wide bridge superstructure will be suspended on a steel arc