Skip to main content

Nepal's bridge issues

Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened.
February 23, 2012 Read time: 1 min
Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened. The bridge links Eastern Lamjung and Tarkughat and has dropped some 150mm. There is concern that the bridge may collapse, although the local government officials still plan to have the official opening for the 75m long steel truss bridge without further repairs or. The structural issues are likely to have been caused by high water flow rates, which could have affected the formwork in place during the pre-casting process. Bridge scour is a key problem for bridges in Nepal due to the high velocity water flow rates in this mountainous country.

Related Content

  • A-HID wins Széchenyi Chain Bridge work
    January 29, 2021
    The Hungarian capital Budapest had received four bids for the work.
  • Times they are a changing
    July 23, 2012
    Construction in China still appears to be on course for growth even with the gloomy economic outlook, as it enjoys "a strong budgets position." Patrick Smith reports One thing is certain in the current global economic climate: nothing is certain. And while China has not been unaffected by the economic events of recent months it has, according to Robert Zoellinck, president of the World Bank, a very strong current account and budgetary position. For some years, the nation has enjoyed double digit growth (the
  • New methods for non-destructive concrete testing
    August 29, 2017
    How best is it possible to assess the state of concrete in a road pavement, bridge deck or tunnel wall? One of the most reliable ways is to take a core of concrete from the structure to analyse and test in the laboratory. One downside to this method is that doing the test creates weak points in the structure that must then be repaired. Another is that the frequency of such cores cannot be too great – so it is possible that some problem areas will be missed. New technologies from the world of geospatial eng
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.