Skip to main content

Nepal's bridge issues

Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened.
February 23, 2012 Read time: 1 min
Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened. The bridge links Eastern Lamjung and Tarkughat and has dropped some 150mm. There is concern that the bridge may collapse, although the local government officials still plan to have the official opening for the 75m long steel truss bridge without further repairs or. The structural issues are likely to have been caused by high water flow rates, which could have affected the formwork in place during the pre-casting process. Bridge scour is a key problem for bridges in Nepal due to the high velocity water flow rates in this mountainous country.

Related Content

  • Colombia’s latest bridge project
    October 12, 2018
    The new contract for Colombia’s Chirajara Bridge project has now been awarded to a consortium, Eiffage-Puentes y Torones. The consortium will handle the design and construction work for the new bridge. The structure will be a replacement for the earlier bridge, which collapsed as its construction was being finalised in January 2018, just a few months before it had been scheduled to open for traffic in March 2018. The collapse of the earlier structure resulted in 10 fatalities as well as causing serious inju
  • New EU-Russian highway connection
    February 18, 2013
    Among the forests and lakes of Finland, one of Europe's newest motorway links is being built as a Green highway linking Europe to Russia - Adrian Greeman reports The road eastwards from Finland's capital Helsinki, along the north coast of the Gulf of Finland, has not carried heavy traffic volumes, at least until recent times. Highway seven as it is designated locally, or E18 in European nomenclature, is partly motorway but in some sections still dual carriageway or even just a single lane each way, finishin
  • Tenders in for Budapest’s Chain Bridge
    September 17, 2020
    Work on the 19th century Széchenyi Chain Bridge could start in March.
  • The Cebu–Cordova Link Expressway
    September 19, 2021
    The 8.5km CCLEx, as it is known, will include the longest and tallest bridge in the Philippines when the structure is finished next year