Skip to main content

Nepal's bridge issues

Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened.
February 23, 2012 Read time: 1 min
Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened. The bridge links Eastern Lamjung and Tarkughat and has dropped some 150mm. There is concern that the bridge may collapse, although the local government officials still plan to have the official opening for the 75m long steel truss bridge without further repairs or. The structural issues are likely to have been caused by high water flow rates, which could have affected the formwork in place during the pre-casting process. Bridge scour is a key problem for bridges in Nepal due to the high velocity water flow rates in this mountainous country.

Related Content

  • Protecting the roadway with guard rails
    November 10, 2015
    Tata Construction Products is a major player in the European road protection market and aims to boost its share of business - Mike Woof writes. Part of the massive Tata Group, Tata Construction Products is a major player in Europe’s business segment for steel guard rails. Rodney Rice, marketing manager, Tata Steel Construction Products, said, “Our market is predominantly Europe.”
  • Nepal's road connectivity is pushing ahead
    December 17, 2012
    A new project by the Government of Nepal recently connected Mugu a distant, mountainous and remote district of Karnali Zone to the country’s road connectivity and has been the 73rd district of the 75 in road connection. The road was opened officially by Nepal’s prime minister, Dr Baburam Bhattarai, while The minister for Physical Planning and Transport Management Hrideyesh Tripathy, finance minister Barha Man Pun, chief of army staff Gaurav Shumser Rana and vice-chairman Dipendra Bahadur Chhetri of Nationa
  • Romania’s important bridge project
    October 5, 2022
    Romania’s important Braila Bridge project will deliver a key crossing spanning the Danube River
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o