Skip to main content

Nepal's bridge issues

Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened.
February 23, 2012 Read time: 1 min
Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened. The bridge links Eastern Lamjung and Tarkughat and has dropped some 150mm. There is concern that the bridge may collapse, although the local government officials still plan to have the official opening for the 75m long steel truss bridge without further repairs or. The structural issues are likely to have been caused by high water flow rates, which could have affected the formwork in place during the pre-casting process. Bridge scour is a key problem for bridges in Nepal due to the high velocity water flow rates in this mountainous country.

Related Content

  • VST used on Portuguese bridge
    February 17, 2012
    PERI says that its new VST heavy-duty shoring tower serves as load-bearing scaffold for the large bridge and civil engineering projects. Each leg on the VST (VARIOKIT Shoring Tower) system can carry a load of around 600kN (the weight of about 60 VW Golf cars or one Leopard-2 tank), and the extremely flexible modular system can be assembled as segmental sections, towers or shoring tower frames for heights up to 40m.
  • VIDEO: Saskatoon’s Traffic Bridge demolished to make way for new bridge
    January 11, 2016
    A 100-year-old Parker truss bridge in western Canada had no official name until its 90th birthday, in 2007. Now, The Traffic Bridge – across the South Saskatchewan River in the city of Saskatoon - is no more, after its demolition earlier this month.

    The Traffic Bridge, nearly 6m wide and 290m long and took a year to build, and was Saskatoon’s first bridge across the river when it opened in 1907. The bridge was built by Winnipeg city-based John D. Gunn and Sons.
  • Bulgaria: back on track?
    July 23, 2012
    Several important Bulgarian road projects are expected to gain momentum over the coming weeks, a welcome boost for a sector that has been beset by delays in the past. In mid-September, the National Road Infrastructure Agency (NRIA) announced that it would soon be declaring new tenders for the construction of two key road projects worth a total of US$94 million (approximately €68.8 million). One section will link the south-eastern city of Kardzhali to Podkova, near the Greek border: the second will connect t
  • Planning road repairs efficiently
    August 21, 2015
    Limited highways maintenance budgets can deliver more with a planned asset management approach - *Will Baron. In recent years, a growing number of local and highways authorities have found themselves trapped in a vicious cycle of reactive road repairs. Several bad winters, floods and years of under-investment have taken their toll on road networks. This has led to political and public pressure to patch up potholes and make emergency repairs, ultimately diverting funds away from planned highways maintenance.