Skip to main content

Nepal's bridge issues

Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened.
February 23, 2012 Read time: 1 min
Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened. The bridge links Eastern Lamjung and Tarkughat and has dropped some 150mm. There is concern that the bridge may collapse, although the local government officials still plan to have the official opening for the 75m long steel truss bridge without further repairs or. The structural issues are likely to have been caused by high water flow rates, which could have affected the formwork in place during the pre-casting process. Bridge scour is a key problem for bridges in Nepal due to the high velocity water flow rates in this mountainous country.

Related Content

  • Sunderland’s Northern Spire bridge opens
    August 28, 2018
    Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather. The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project. Work began in May 2015 and the bridge has been built within its allocated €129 million budget. However, poor weather conditions pushed back the opening of the bridge from this past
  • Concrete barriers help to minimise accidents
    July 12, 2012
    Concrete barriers offer a highway safety solution - Mike Woof writes. Concrete safety barriers are being installed on many of Europe's major highways, particularly for use as centre lane dividers. The strength and durability of concrete barriers can help reduce the risk of cross over accidents, one of several topics raised at a conference in Brussels on concrete highway barriers organised by the European Concrete Paving Association, EUPAVE. The conference was opened by Yves Deceoene of the IRF's Belgian ex
  • Historic Oakland Bay Bridge receives a new asphalt road surface
    March 31, 2014
    Part of an iconic US bridge has been given a new lease of life, as Mike Woof reports The western section of the historic Oakland Bay Bridge in the US state of California has recently benefited from a series of improvements to strengthen its structural integrity and also upgrade the running surface. Contractor OC Jones & Sons of Berkeley CA, paved large portions of the bridge, taking on two different projects as part of the work. First was placement of the specialised epoxy on the self-anchored suspension (S
  • ERF invites Polish Road Congress’ perspective on Road Markings
    May 14, 2014
    On 5 March 2014, the Polish Road Congress organised a consultation seminar on road markings standards across the EU The conference followed the publication of the latest proposal by the ERF for an EU-wide intervention and maintenance policy for road markings, commonly known as 150x150. The proposed policy illustrates the ERF’s view that road markings should have a minimum width of 150mm for all roads, and their performance should not be allowed to drop below 150mcd/lux/m² (R3) in dry weather conditions a