Skip to main content

Nepal's bridge issues

Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened.
February 23, 2012 Read time: 1 min
Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened. The bridge links Eastern Lamjung and Tarkughat and has dropped some 150mm. There is concern that the bridge may collapse, although the local government officials still plan to have the official opening for the 75m long steel truss bridge without further repairs or. The structural issues are likely to have been caused by high water flow rates, which could have affected the formwork in place during the pre-casting process. Bridge scour is a key problem for bridges in Nepal due to the high velocity water flow rates in this mountainous country.

Related Content

  • Opinions strong on VMS application
    September 26, 2013
    The captains of the motorway squad of Issoire and Clermont l’Hérault said the signs are very legible and understandable but they would have preferred the signs to be mounted on gantries. The law forces also pointed out that the signs are situated on the plains, so the relationship with the traffic conditions in mountains is difficult to make and a reminder near the difficulties would be preferable. Local drivers rely on the signs and change their travel plans and routes accordingly while non-locals ask
  • Wolffkran leads the pack
    December 10, 2024
    At present, the two WOLFF 7534.16 Clear cranes are drawing a lot of attention near Horb in Germany’s Neckar Valley
  • New section planned for the Pennsylvania Turnpike
    March 27, 2020
    A new stretch of road is needed for the Pennsylvania Turnpike.
  • German bridge demolition work assisted by Liebherr
    May 9, 2022
    Construction equipment from Liebherr has played an important role in the project to demolish a bridge in Germany.