Skip to main content

Nepal's bridge issues

Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened.
February 23, 2012 Read time: 1 min
Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened. The bridge links Eastern Lamjung and Tarkughat and has dropped some 150mm. There is concern that the bridge may collapse, although the local government officials still plan to have the official opening for the 75m long steel truss bridge without further repairs or. The structural issues are likely to have been caused by high water flow rates, which could have affected the formwork in place during the pre-casting process. Bridge scour is a key problem for bridges in Nepal due to the high velocity water flow rates in this mountainous country.

Related Content

  • Congestion improves with high occupancy toll lanes
    March 13, 2012
    The potential for high occupancy toll (HOT) lanes in congested US cities offers further room for development, according to US-based transport expert Bob Poole of the Reason Foundation.
  • Congestion improves with high occupancy toll lanes
    February 21, 2012
    The potential for high occupancy toll (HOT) lanes in congested US cities offers further room for development, according to US-based transport expert Bob Poole of the Reason Foundation. At present Atlanta, Dallas, Houston, San Diego, San Francisco and Seattle all feature HOT lanes and Poole believes that the nation's capital, Washington DC, could benefit from a similar approach.
  • Quebec to build new Mercier Bridge for Montreal city
    May 12, 2017
    The Canadian province of Quebec plans to build a US$219 million bridge across the St Lawrence River alongside the existing Mercier Bridge in the city of Montreal. Provincial government cabinet ministers Pierre Moreau and Geoff Kelley confirmed that a new bridge is forthcoming, but gave schedule for procurement or construction start, according to local media. However, Moreau said the work will begin probably before the new Champlain Bridge is finished at the start of 2019. Construction of the new Champlain B
  • Protecting bridge assets over time
    September 1, 2021
    One of the challenges facing transportation agencies today is how to conduct accurate, timely, and safe bridge inspections. Maintaining bridges is important to ensure public safety, and bridge owners and engineers need to perform regular inspections to determine the structural integrity of bridges so that they can plan for maintenance, rehabilitation, and replacement of those bridges.