Skip to main content

Nepal's bridge issues

Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened.
February 23, 2012 Read time: 1 min
Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened. The bridge links Eastern Lamjung and Tarkughat and has dropped some 150mm. There is concern that the bridge may collapse, although the local government officials still plan to have the official opening for the 75m long steel truss bridge without further repairs or. The structural issues are likely to have been caused by high water flow rates, which could have affected the formwork in place during the pre-casting process. Bridge scour is a key problem for bridges in Nepal due to the high velocity water flow rates in this mountainous country.

Related Content

  • Road safety concern for Europe
    May 19, 2015
    A quick look at corporate results for some of the major construction equipment manufacturers paints a somewhat confusing picture of current demand. Caterpillar, the world’s largest manufacturer of off-highway machines and for so long a bell-wether for the construction sector, recently released results showing a drop in profits. CNH and Volvo CE too have been similarly afflicted with a lower than expected financial performance, perhaps a major factor in Volvo CE's decision to pull out of a joint venture part
  • Adavances in concrete vibration technology
    December 13, 2018
    The use of controlled frequency vibration (CFV) technology and its applications in construction continue to grow - *Paul Jaworski Controlled frequency vibration (CFV) technology has been around since the mid-1990s for concrete pavement applications. The technology has seen a gradual increase in acceptance, particularly in certain applications. For the 0-37mm (1.5”) slump pavement mix designs, many contractors were experiencing material separation due to speeds over 8,000vibrations/minute (VPM). With the wi
  • Extreme climates pose tough duty cycles and challenges for testing procedures
    April 5, 2013
    This month we look at how pavement testing technology is responding to extremes of temperature, showcase concrete testing in Doha and look at how water drops could help identify delaminated bridge decks - Kristina Smith reports One of the biggest challenges that pavement engineers face is how to design for extremes of temperature. Designing for cold weather can result in problems at higher temperatures – and vice versa. In Scandinavia, generally a cold climate, they are facing this problem. In the summer,
  • Case equipment helps rebuild local communities after floods
    September 26, 2013
    The floods and burst riverbanks suffered last spring throughout Europe have highlighted once again the importance of having the right equipment at the right time. In Germany and more recently in Spain, Case equipment is said to have been indispensable during recovery work in flood-damaged areas. During June, roads, bridges, homes and forest trails in many urban areas were affected by the heavy rain that led to flooding throughout northern Spain’s entire Aran Valley (Lleida), and the overflowing of the Ga