Skip to main content

Nepal's bridge issues

Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened.
February 23, 2012 Read time: 1 min
Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened. The bridge links Eastern Lamjung and Tarkughat and has dropped some 150mm. There is concern that the bridge may collapse, although the local government officials still plan to have the official opening for the 75m long steel truss bridge without further repairs or. The structural issues are likely to have been caused by high water flow rates, which could have affected the formwork in place during the pre-casting process. Bridge scour is a key problem for bridges in Nepal due to the high velocity water flow rates in this mountainous country.

Related Content

  • Denmark-Sweden’s proposed link
    July 3, 2012
    A proposal for a new bridge from Sweden to Denmark is included in the Swedish government's new infrastructure development plan for the country. The Swedish politicians would prefer a fixed link and they have invited the Danish government to examine the prospects for bridge plans. The Swedish suggestion is for a bridge link across the Sound (Øresund) between Helsingør in Denmark and Helsingborg in Sweden and Danish officials have been invited to comment. This proposal forms part of Sweden’s new infrastructur
  • Peru project postponed for funding issue
    December 20, 2017
    The project to construct the Via Expresa road project in Peru looks likely to be further postponed. Construction of the link, in Peru’s Cusco Region, was to have commenced in the first quarter of 2017. The project was to have been partly paid for by a loan from the World Bank worth US$110 million but first payments for the funding package were delayed. The local authorities are now considering cancelling the loan package altogether and finding another funding source, although this could affect the region’s
  • PERI’s balancing act at the Harpe Bru Bridge in Norway
    May 24, 2016
    Plans for the European Route E6 expansion in Norway include the 320m-long Harpe Bru Bridge over the Gudbrandsdalen Lågen River, at Sør-Fron in Oppland province. For the superstructure, PERI civil engineering technology experts developed a balanced cantilevered solution based on the VARIOKIT Engineering Construction Kit. Statens vegvesen, Norway’s agency for public road building, selected an extradosed cable-stayed bridge design – the first such bridge in Norway. It combines the load-bearing behaviour
  • Using technology so assess road surface quality
    April 4, 2014
    Advances in survey technology and the evolving face of road procurement are driving demand for highway condition data. Mark Thomas, infrastructure services manager at Fugro Aperio writes how surveys of new roads can improve long-term quality While a growing suite of non-intrusive testing, measurement and survey technologies are widely used to target highway repairs and to determine asset management strategies, the use of these powerful tools remains patchy in the early stages of the infrastructure life cycl