Skip to main content

Nepal's bridge issues

Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened.
February 23, 2012 Read time: 1 min
Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened. The bridge links Eastern Lamjung and Tarkughat and has dropped some 150mm. There is concern that the bridge may collapse, although the local government officials still plan to have the official opening for the 75m long steel truss bridge without further repairs or. The structural issues are likely to have been caused by high water flow rates, which could have affected the formwork in place during the pre-casting process. Bridge scour is a key problem for bridges in Nepal due to the high velocity water flow rates in this mountainous country.

Related Content

  • Helsinki's tunnel project
    May 9, 2012
    A novel approach to utilities installation will lengthen the life of Helsinki's streets, reports Mike Woof. A major utilities project in Finnish capital Helsinki will offer huge benefits for the city's streets and traffic flow rates in years to come. A new tunnel system is being excavated under Helsinki for the power company Helsingin Energia, although this will be co-owned by the city. Called the Common Utility Tunnel (Meilahti-Pasilak-Käpylä LU2), the excavations form an extensive network spreading out un
  • European regulations for engine emissions are getting tougher
    January 17, 2013
    Emissions remain the focus for engine development but equipment manufacturers want clarity from regulators Emissions remain a major challenge for the off-highway construction equipment market. The EU has tough targets in this respect and its objective is an overall reduction of CO2 emissions of 80-95% by the year 2050, compared to 1990 levels. There is considerable research already underway on how to reduce fuel consumption and to help ensure the security of energy supply. A number of industry sectors, such
  • Contraflow with Mike Woof
    August 2, 2012
    ‘Before I get down to this month’s main agenda, I’d like to draw your attention to a range of improvements that we’ve made to the content of World Highways. In conjunction with a fresher look, we have introduced features both long and short: At the ‘long’ end of the scale in our World Report…this month the subject is Australian roads…and at the ‘short’ end of the scale is the five-minute interview with an industry personality. Our equipment features have been beefed up with more analysis, and the signpostin
  • Italian viaduct job for Conjet
    July 4, 2012
    The multi-span reinforced concrete viaduct at Torano, about 100km east of the Italian capital Rome, is a major structure on the main E80/A24/A25 Autostrada crossing central Italy. The Viadotto Fiume Salto was opened in the late 1960s, but the use of de-icing salts during winter months has since caused considerable calcium chloride damage to the structure forcing the Italian Highways Authority and the Autostrada di Parchi's owner Toto to carry out extensive repairs. The renovation estimated at around €5 mill