Skip to main content

Nepalese road and bridge route

The new steel-truss bridge linking Simikot in Nepal’s Humla district headquarters has now been inaugurated. The road will link Nepal with Hilsa in China and the bridge will span the Karnali River. This bridge will be completed within a year and the Nepalese Government will award the road construction to the Nepalese Army to speed work. The road was started 10 years ago but progress was slow and could not be completed due to insufficient budget. Helicopters will have to be used to carry some of the construct
April 25, 2012 Read time: 1 min
The new steel-truss bridge linking Simikot in Nepal’s Humla district headquarters has now been inaugurated. The road will link Nepal with Hilsa in China and the bridge will span the Karnali River. This bridge will be completed within a year and the Nepalese Government will award the road construction to the Nepalese Army to speed work. The road was started 10 years ago but progress was slow and could not be completed due to insufficient budget. Helicopters will have to be used to carry some of the construction material for the road construction work. This road will help boost trade between the countries and of the 90km route, some 35km has been built so far.

Related Content

  • Braila Bridge in Romania inauguration
    June 27, 2023
    Romania’s landmark Braila Bridge link is having its official inauguration.
  • Nepal safety issues
    April 27, 2012
    The authorities in Nepal are establishing a road safety plan that is intended to reduce the country’s annual injury and fatality rates. Nepal’s Traffic Police Directorate recently announced figures showing that of the 8,503 accidents recorded in the 2010-2011 financial year, 4,914 occurred within the Kathmandu Valley. The police also said that factors causing accidents included the poor state of gravel and surfaced roads and inadequate traffic signs. Potholes are a major problem on Nepal’s road system accor
  • Bulgaria breaks ground for Martisa River bridge
    August 23, 2023
    The contract was awarded to local engineering firm GBS-Infrastructure Construction in Plovdiv, a subsidiary of the Bulgarian civil engineering group Glavbolgarstroy.
  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.