Skip to main content

Nepalese Government pushes ahead with transport infrastructure programme

The Nepalese Government has announced a major programme of transport infrastructure works for the 2014-2015 period. Road, highway and airport projects have all been prioritised. The detailed project report for the Kathmandu-Tarai Fast Track Road is to be completed within six months. The proposal aims to attract investors by guaranteeing a minimum number of vehicles using the tolled link. The project has been delayed due funding issues. This period will also see work being carried out the Mid-Hills Highway,
July 17, 2014 Read time: 2 mins

The 5283 Nepalese Government has announced a major programme of transport infrastructure works for the 2014-2015 period. Road, highway and airport projects have all been prioritised. The detailed project report for the Kathmandu-Tarai Fast Track Road is to be completed within six months. The proposal aims to attract investors by guaranteeing a minimum number of vehicles using the tolled link. The project has been delayed due funding issues. This period will also see work being carried out the Mid-Hills Highway, including a new asphalt surface for a 66km stretch, gravelling a further 20km and building 20 bridges. Some $72.7 million will be spent on building and upgrading airports. Construction of Gautam Budhha Regional Airport and Pokhara Airport is due to commence shortly. Meanwhile residents in Nijgadh town, Bara district are being relocated to allow work to go ahead on a second international airport. The current Tribhuwan International Airport (TIA) will see technology upgrades, while Biratnagar, Nepalgunj and Dhangadi will be developed as regional airports. There are also plans to buy five aircraft and the transport infrastructure programme of road and air connections is intended to help boost tourism.

For more information on companies in this article

Related Content

  • Nepal's upgraded links
    May 25, 2012
    The Indian Government is providing assistance for road construction work in neighbouring Nepal. This assistance is for building the Kulekhani – Kathmandu road section, which will be widened and upgraded with an asphalt surface. The road will be widened to 7.5m and the work is being carried out by Indian Contractor Golden Goods. Meanwhile asphalt surfacing work is has now been completed on Nepal’s Hetauda-Bhimphedi-Kulekhani-Pharphing-Chaimale road Section. Surfacing work is in hand on the remaining 21km sec
  • Times they are a changing
    July 23, 2012
    Construction in China still appears to be on course for growth even with the gloomy economic outlook, as it enjoys "a strong budgets position." Patrick Smith reports One thing is certain in the current global economic climate: nothing is certain. And while China has not been unaffected by the economic events of recent months it has, according to Robert Zoellinck, president of the World Bank, a very strong current account and budgetary position. For some years, the nation has enjoyed double digit growth (the
  • Transstroy improving Russia’s aviation infrastructure
    January 21, 2014
    Aviation is playing an important role in developing Russia’s economy and resolving socio-economic issues. It’s particularly important for the country’s role as an international and domestic hub, ensuring the transportation of residents from remote regions
  • Riyadh’s transport infrastructure upgrade programme
    August 29, 2013
    IRF chairman and mayor of Riyadh, Eng Abdullah A Almogbel, discusses the city’s massive infrastructure investment and the pressing need for this development work Saudi Arabian capital Riyadh is fast growing with a pressing need for additional transport infrastructure resulting in a massive investment programme. The oil industry has fuelled Riyadh’s rapid expansion from being a medium sized town just 100 years ago, to its status as a major city today. With the explosion in vehicle use during the 20th ce