Skip to main content

Nepalese bridge issues

In Nepal a 159m long suspension bridge spanning the Trishuli River has collapsed, killing two and injuring 17 while five people are posted as missing. Meanwhile in neighbouring India, an old wooden bridge spanning the Rangit River has collapsed killing 32, injuring 70 and leaving 35 missing. A significant portion of those killed, injured or missing are Nepali speaking tea workers.
May 4, 2012 Read time: 2 mins
In Nepal a 159m long suspension bridge spanning the Trishuli River has collapsed, killing two and injuring 17 while five people are posted as missing. Meanwhile in neighbouring India, an old wooden bridge spanning the Rangit River has collapsed killing 32, injuring 70 and leaving 35 missing. A significant portion of those killed, injured or missing are Nepali speaking tea workers.

The suspension bridge over the Trishuli River was built 18 years ago and connected Bhumlichowk in Gorkha district and Fishling of Chitwan district, close to the Prithivi Highway.

The Indian bridge that collapsed was considerably older and may have dated back before India gained its independence according to sources. The structure was located some 80km from Darjeeling and connected Bijanbari with Chungthung providing a key route for the local tea industry.

On a more positive note, Nepal’s Ministry for Physical Planning and Works has inaugurated work to a bridge over Kamala River. This bridge will connect the Siraha and Dhanusa district headquarters and forms part of the Postal Highway network.

The pre-stressed girder bridge will measure 450m long by 7.5m wide and will be completed within the end of 2014, reducing the current journey distance from Siraha – Janakpur. The country’s new Postal Highways will boost development of the Terai Region and are being prioritised. Work to a further 53 bridges will also form part of the Postal Highway system and some funding will be provided by India.

Related Content

  • Albanian road investment
    May 15, 2012
    The European Bank for Reconstruction and Development (EBRD) is providing major funding in Albania’s road network. A loan worth €53 million will help pay for the construction of the new Fier and Vlore bypasses. This loan will aid further development of the Albanian road network and boosting economic integration in the country by co-financing the construction of the two bypass roads, located in south-western Albania. The EBRD loan is structured in two tranches and will be used by the Albanian Road Authority t
  • Bidding for Uganda road connecting Kampala and Jinja
    May 22, 2018
    In Uganda bidding is now underway for the new expressway project to improve transport between capital Kampala and the industrial city of Jinja. The project for the 95km section of road is expected to cost US$1 billion to construct. The contract is being offered under the design, finance, build and operate model, with the route then being handed back to the Ugandan Government once the agreed concession period is complete. Some of the financing will be provided by the Africa Development Bank (AfDB), French De
  • Zipping up road lanes – with Barrier Systems
    September 10, 2018
    QMB has a Lindsay Road Zipper on duty near Montreal. World Highways deputy editor David Arminas climbed aboard As vice president of Canadian barrier specialist QMB, based in Laval, Quebec, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost volume on a road without disrupting tra
  • ARTBA highlights US bridge issues
    May 10, 2016
    The American Road & Transportation Builders Association (ARTBA) is calling for more bridge repairs in the US. There are still too many structurally deficient bridges in the country according to a recent analysis. This report states that while there were 2,574 fewer structurally deficient bridges in 2015 compared to the number in 2014, there are still 58,500 on the structurally deficient list. Worse still, at the current pace of bridge investment it will take at least 21 years before these bridges are all r