Skip to main content

Nepalese bridge issues

In Nepal a 159m long suspension bridge spanning the Trishuli River has collapsed, killing two and injuring 17 while five people are posted as missing. Meanwhile in neighbouring India, an old wooden bridge spanning the Rangit River has collapsed killing 32, injuring 70 and leaving 35 missing. A significant portion of those killed, injured or missing are Nepali speaking tea workers.
May 4, 2012 Read time: 2 mins
In Nepal a 159m long suspension bridge spanning the Trishuli River has collapsed, killing two and injuring 17 while five people are posted as missing. Meanwhile in neighbouring India, an old wooden bridge spanning the Rangit River has collapsed killing 32, injuring 70 and leaving 35 missing. A significant portion of those killed, injured or missing are Nepali speaking tea workers.

The suspension bridge over the Trishuli River was built 18 years ago and connected Bhumlichowk in Gorkha district and Fishling of Chitwan district, close to the Prithivi Highway.

The Indian bridge that collapsed was considerably older and may have dated back before India gained its independence according to sources. The structure was located some 80km from Darjeeling and connected Bijanbari with Chungthung providing a key route for the local tea industry.

On a more positive note, Nepal’s Ministry for Physical Planning and Works has inaugurated work to a bridge over Kamala River. This bridge will connect the Siraha and Dhanusa district headquarters and forms part of the Postal Highway network.

The pre-stressed girder bridge will measure 450m long by 7.5m wide and will be completed within the end of 2014, reducing the current journey distance from Siraha – Janakpur. The country’s new Postal Highways will boost development of the Terai Region and are being prioritised. Work to a further 53 bridges will also form part of the Postal Highway system and some funding will be provided by India.

Related Content

  • KIT to study bridge vibration data
    July 7, 2025
    In Germany, the Karlsruhe Institute of Technology, KIT, will use acceleration sensors to gather vibration data from bridges to pinpoint structural degradation.
  • Norway’s wooden Flisa Bridge reopens
    October 17, 2022
    The three-span 196m-long truss bridge in the city of Flisa, south-eastern Norway, was closed immediately after the Tretten Bridge collapse.
  • Nepal highway subsidence problem causing traffic disturbance
    March 11, 2017
    Subsidence on a key stretch of highway in Nepal is causing major traffic disturbance. The BP Highway, also known as the Banepa- Sindhuli- Bardibas Road, has suffered subsidence on the Nepalthok-Khurkot stretch. The collapsed section measures 27m long and is causing delays for drivers. This Highway is an important route as it connets Nepal’s capital Kathmandu with Eastern Terai. Vehicles have been diverted to an alternative route, although part of the roadway is still being used to carry traffic in one d
  • Nepal-China connection
    May 14, 2012
    The Chinese Government is building a 100m long bridge over the Trishuli River that will improve connections from Nepal-China. The structure will be located in Rasuwaghadi and the project has been planned after both countries agreed a deal for this second friendship bridge. The bridge is expected to cost US$ 1.42 million and its construction is being funded by the Chinese Government. The new link will connect the Rasuwaghadi Highway with China and is expected to help develop cross-country trade and transport