Skip to main content

The Nepalese authorities are now addressing structural problems on a series of important bridge links in the country

Major structural problems have been identified in several bridges in Nepal.
March 1, 2012 Read time: 2 mins
Major structural problems have been identified in several bridges in Nepal. Construction work on seven large bridges in Nepal has been halted due to the problems arising in the pier construction.

Work has been stopped on bridges located at Ghurmi and carrying the Udayapur-Okhaldhunga road over the Sunkoshi River and at Khurkot carrying the Sindhuli-Manthali road over the Sunkoshi River. Work has also halted on a bridge in West Nepal carrying the Chnichu-Jajarkot road over the Bheri River, on the Tawa River bridge, the Siwai bridge, the Tadi bridge at Nuwakot and on the bridge over the Junga River at Dhanusa.

A bridge expert in Nepal says that due to geological conditions in Nepal, pier construction faces problems. The expert suggests that bridges with piers should be avoided in the country and that arched structures, though more expensive to build, are more suitable for the country's rugged terrain and would offer long term cost benefits through reduced maintenance needs.

Pier problems at the Bheri Bridge have resulted in it being replaced by a suspension bridge and this has been suggested as another suitable bridge design solution for the country. The issue is endemic, with the country's geology and geography playing a key role. Bridge scour is a serious problem in Nepal, due to the country's mountainous terrain, deep rock valleys and fast flowing rivers. 2664 Nepal's Department of Roads has issue a notice that a further seven bridges are in a serious condition and require repairs.

Bridges requiring repair are at Mugling carrying the Prithvi Highway, the Marsyangdi Bridge carrying the Aanbukhaireni-Gorkha road, the Seti bridge carrying the Khaireni-Bhimad road, the Jharahi bridge carrying the Mahendra highway and the Kaligandaki bridge carrying the Siddhartha highway. The other structures are the Bheri bridge carrying the Ratna highway, the Tamakoshi bridge carrying the Lamosanghu road, the Sunkoshi bridge carrying the Lamosanghu - Jiri road and the Tadi bridge carrying the Pasanglamhu road.

For more information on companies in this article

Related Content

  • Italy road tunnel project excavated
    July 9, 2018
    Italy’s A3 Highway is being upgraded, which will improve transport between Salerno and Calabria. Upgrading Italy’s A3 highway is of prime importance for developing the south of the country and is a project that has been prioritised for construction. The A3 Salerno-Reggio-Calabria highway is a non-toll road managed by ANAS, Italy’s state-owned company that constructs and maintains highways. The route runs a total of 443km, with the road having originally been built between 1966 and 1974. However, the origina
  • Italian viaduct job for Conjet
    July 4, 2012
    The multi-span reinforced concrete viaduct at Torano, about 100km east of the Italian capital Rome, is a major structure on the main E80/A24/A25 Autostrada crossing central Italy. The Viadotto Fiume Salto was opened in the late 1960s, but the use of de-icing salts during winter months has since caused considerable calcium chloride damage to the structure forcing the Italian Highways Authority and the Autostrada di Parchi's owner Toto to carry out extensive repairs. The renovation estimated at around €5 mill
  • Indonesia building bridges to remote villages
    June 28, 2017

    Indonesia is setting out plans for a programme of bridge construction that will help boost access to many of its most remote villages. The country’s mountainous regions suffer from poor access due to limited transport infrastructure at present. The aim of the programme will be to construct up to 60 new bridges to improve accessibility, which will help boost economic development in these remote rural regions. Suspension bridges are likely to be used in many instances due to the suitability of this type of structure for the challenging, mountainous topography.

  • Liebherr cranes on the Rader
    December 10, 2024
    Germany’s Rader High Bridge spanning the Kiel Canal along Germany’s A7 motorway is to be replaced and widened over the next few years. Eighteen Liebherr cranes are handling the lifting.