Skip to main content

The Nepalese authorities are now addressing structural problems on a series of important bridge links in the country

Major structural problems have been identified in several bridges in Nepal.
March 1, 2012 Read time: 2 mins
Major structural problems have been identified in several bridges in Nepal. Construction work on seven large bridges in Nepal has been halted due to the problems arising in the pier construction.

Work has been stopped on bridges located at Ghurmi and carrying the Udayapur-Okhaldhunga road over the Sunkoshi River and at Khurkot carrying the Sindhuli-Manthali road over the Sunkoshi River. Work has also halted on a bridge in West Nepal carrying the Chnichu-Jajarkot road over the Bheri River, on the Tawa River bridge, the Siwai bridge, the Tadi bridge at Nuwakot and on the bridge over the Junga River at Dhanusa.

A bridge expert in Nepal says that due to geological conditions in Nepal, pier construction faces problems. The expert suggests that bridges with piers should be avoided in the country and that arched structures, though more expensive to build, are more suitable for the country's rugged terrain and would offer long term cost benefits through reduced maintenance needs.

Pier problems at the Bheri Bridge have resulted in it being replaced by a suspension bridge and this has been suggested as another suitable bridge design solution for the country. The issue is endemic, with the country's geology and geography playing a key role. Bridge scour is a serious problem in Nepal, due to the country's mountainous terrain, deep rock valleys and fast flowing rivers. 2664 Nepal's Department of Roads has issue a notice that a further seven bridges are in a serious condition and require repairs.

Bridges requiring repair are at Mugling carrying the Prithvi Highway, the Marsyangdi Bridge carrying the Aanbukhaireni-Gorkha road, the Seti bridge carrying the Khaireni-Bhimad road, the Jharahi bridge carrying the Mahendra highway and the Kaligandaki bridge carrying the Siddhartha highway. The other structures are the Bheri bridge carrying the Ratna highway, the Tamakoshi bridge carrying the Lamosanghu road, the Sunkoshi bridge carrying the Lamosanghu - Jiri road and the Tadi bridge carrying the Pasanglamhu road.

For more information on companies in this article

Related Content

  • Figures reveal road fatality increase for UK
    February 5, 2015
    Road fatalities increased in the UK during 2014, compared with 2013. The latest official figures from the Department for Transport (DfT) show there were 1,730 deaths on British roads by the year ending in September in 2014, a gain of 1% over the same period for 2013. Worse still, the total killed or seriously injured (KSI) total climbed 4% to 24,360 and child casualties rose 3% to 2,060. Cyclist deaths and serious injuries are up 8% to 3,500. For the year ending September 2014, there were 192,910 reported r
  • Construction sector's quiet revolution for digital worksites
    February 8, 2017
    The digital worksite topped the agenda at this year’s CECE congress. David Arminas reports from the Czech capital Prague* Europe’s equipment manufacturers and their clients are truly in an age of transformation driven by an increasing move towards the digital worksite. Because this transformation is so deep, there looms big challenges for the entire sector and its supply chain, noted Bernd Holz, president of the CECE – Committee for European Construction Equipment, Europe’s umbrella organisation for
  • Contract problem for Algeria’s East-West Highway
    October 10, 2014
    Further problems surround the project to construct Algeria’s East-West Highway. Much of the route is complete, however a number of sections have faced delays with disputes having developed between contractors and the Algerian Government, which is overseeing the project. This latest development has seen the Algerian Ministry for Public Works announcing that the Japanese firm Cojaal has lost its contract to construct the remaining 84km of the eastern section of the East-West highway. It is not clear at presen
  • Eyes on the road – the distraction problem
    June 23, 2016
    The news that Europe’s road safety drive stalled in 2015 is a cause for concern. The actual causes of this stutter in the road with regard to boosting safety have yet to be identified. But it is highly likely that driver distraction plays a role, at least in part. There is plenty of research showing just how much of a risk the use of cellphones pose for drivers. And yet far too many drivers are blasé about the risks these pose for driver distraction. The sight of someone using a cellphone at the wheel i