Skip to main content

The Nepalese authorities are now addressing structural problems on a series of important bridge links in the country

Major structural problems have been identified in several bridges in Nepal.
March 1, 2012 Read time: 2 mins
Major structural problems have been identified in several bridges in Nepal. Construction work on seven large bridges in Nepal has been halted due to the problems arising in the pier construction.

Work has been stopped on bridges located at Ghurmi and carrying the Udayapur-Okhaldhunga road over the Sunkoshi River and at Khurkot carrying the Sindhuli-Manthali road over the Sunkoshi River. Work has also halted on a bridge in West Nepal carrying the Chnichu-Jajarkot road over the Bheri River, on the Tawa River bridge, the Siwai bridge, the Tadi bridge at Nuwakot and on the bridge over the Junga River at Dhanusa.

A bridge expert in Nepal says that due to geological conditions in Nepal, pier construction faces problems. The expert suggests that bridges with piers should be avoided in the country and that arched structures, though more expensive to build, are more suitable for the country's rugged terrain and would offer long term cost benefits through reduced maintenance needs.

Pier problems at the Bheri Bridge have resulted in it being replaced by a suspension bridge and this has been suggested as another suitable bridge design solution for the country. The issue is endemic, with the country's geology and geography playing a key role. Bridge scour is a serious problem in Nepal, due to the country's mountainous terrain, deep rock valleys and fast flowing rivers. 2664 Nepal's Department of Roads has issue a notice that a further seven bridges are in a serious condition and require repairs.

Bridges requiring repair are at Mugling carrying the Prithvi Highway, the Marsyangdi Bridge carrying the Aanbukhaireni-Gorkha road, the Seti bridge carrying the Khaireni-Bhimad road, the Jharahi bridge carrying the Mahendra highway and the Kaligandaki bridge carrying the Siddhartha highway. The other structures are the Bheri bridge carrying the Ratna highway, the Tamakoshi bridge carrying the Lamosanghu road, the Sunkoshi bridge carrying the Lamosanghu - Jiri road and the Tadi bridge carrying the Pasanglamhu road.

For more information on companies in this article

Related Content

  • Russia and Azerbaijan move closer to a new Samur River Bridge
    June 4, 2015
    Moscow-based infrastructure group Doraeroproekt Institute will design a bridge over the Samur River under an agreement between Russia and Azerbaijan. The new bridge will carry around 37,000 vehicles a day and link the two villages of Samur in Azerbaijan and the Russian village of Yarag-Kazmalar. The announcement follows the signing by the two governments of a bridge protocol in mid-2013 as part of other infrastructure project agreements. Azerbaijan will finance bridge construction and Russia will c
  • Nepal plans major infrastructure development
    July 21, 2015
    Nepal’s Ministry of Physical Infrastructure and Transport Management has been allocated US$524.48 million in the 2015-16 budget for developing infrastructure projects in the country. The country is faced with an additional challenge at present of repairing the links wrecked by the powerful earthquake that caused extensive damage all across Nepal. A budget of $309.8 million is being used for the Postal Highway, while a budget of $189.4 million has been set for the Mid-Hill highway. Some $97.1 million is bein
  • Funding for Washington-Oregon bridge project
    May 15, 2023
    A funding plan is proposed for the new Washington-Oregon bridge project.
  • São Paulo's landmark bridge construction
    February 21, 2012
    To improve access from the east to São Paulo city centre, main contractor Construbase Engenharia is building a road complex comprising three viaducts and access ramps. The greatest challenge in Brazil's largest city is the showpiece Padre Adelino viaduct, a 122m long single-arch, single-span, cable-stayed concrete bridge moulded in situ with a parabola-shaped arch and a single-cell post-tensioned cantilever caisson