Skip to main content

The Nepalese authorities are now addressing structural problems on a series of important bridge links in the country

Major structural problems have been identified in several bridges in Nepal.
March 1, 2012 Read time: 2 mins
Major structural problems have been identified in several bridges in Nepal. Construction work on seven large bridges in Nepal has been halted due to the problems arising in the pier construction.

Work has been stopped on bridges located at Ghurmi and carrying the Udayapur-Okhaldhunga road over the Sunkoshi River and at Khurkot carrying the Sindhuli-Manthali road over the Sunkoshi River. Work has also halted on a bridge in West Nepal carrying the Chnichu-Jajarkot road over the Bheri River, on the Tawa River bridge, the Siwai bridge, the Tadi bridge at Nuwakot and on the bridge over the Junga River at Dhanusa.

A bridge expert in Nepal says that due to geological conditions in Nepal, pier construction faces problems. The expert suggests that bridges with piers should be avoided in the country and that arched structures, though more expensive to build, are more suitable for the country's rugged terrain and would offer long term cost benefits through reduced maintenance needs.

Pier problems at the Bheri Bridge have resulted in it being replaced by a suspension bridge and this has been suggested as another suitable bridge design solution for the country. The issue is endemic, with the country's geology and geography playing a key role. Bridge scour is a serious problem in Nepal, due to the country's mountainous terrain, deep rock valleys and fast flowing rivers. 2664 Nepal's Department of Roads has issue a notice that a further seven bridges are in a serious condition and require repairs.

Bridges requiring repair are at Mugling carrying the Prithvi Highway, the Marsyangdi Bridge carrying the Aanbukhaireni-Gorkha road, the Seti bridge carrying the Khaireni-Bhimad road, the Jharahi bridge carrying the Mahendra highway and the Kaligandaki bridge carrying the Siddhartha highway. The other structures are the Bheri bridge carrying the Ratna highway, the Tamakoshi bridge carrying the Lamosanghu road, the Sunkoshi bridge carrying the Lamosanghu - Jiri road and the Tadi bridge carrying the Pasanglamhu road.

For more information on companies in this article

Related Content

  • Lochkov bridge construction time 'cut'
    July 17, 2012
    As part of the R1 southern orbital motorway around the Czech capital, Prague, a joint venture is building a five-span, 461m long and approximately 65m high viaduct near the village of Lochkov, as a girder bridge construction. For the two steeply inclined twin piers, Doka has supplied an automatic climbing formwork solution that obviates the need for shoring and that will "cut more than 100 days from the construction period." Cast-in-place concrete construction of bridge piers with such a steep inclination
  • 2012 was record road death low in most OECD-IRTAD countries, says report
    May 23, 2013
    The year 2012 is said to have seen the lowest road deaths on record within most OECD (Organisation of Economic Co-operation and Development) and IRTAD (International Traffic Safety Data and Analysis Group) countries. However, the IRTAD Annual Road Safety Report 2013, published yesterday by the International Transport Forum at the OECD, also claims road safety performance in terms of fatalities per 100,000 of population varies considerably among OECD-IRTAD countries. The difference between the best and the w
  • Construction future for CEA
    July 18, 2012
    The UK’s Construction Equipment Association plays a key role in Europe - Mike Woof writes The UK’s Construction Equipment Association (CEA) is playing an important role within Europe, for manufacturers, customers and also for the wider benefit of industry as a whole. One important project where the CEA is closely involved with other sister organisations within the pan-European organisation CECE is with the rationalisation of machine regulations. Requirements were supposed to have been harmonised in 1992, an
  • Pennsylvania-New Jersey bridge link upgrade planned
    November 7, 2023
    Upgrade work is planned for a bridge linking Pennsylvania and New Jersey.