Skip to main content

The Nepalese authorities are now addressing structural problems on a series of important bridge links in the country

Major structural problems have been identified in several bridges in Nepal.
March 1, 2012 Read time: 2 mins
Major structural problems have been identified in several bridges in Nepal. Construction work on seven large bridges in Nepal has been halted due to the problems arising in the pier construction.

Work has been stopped on bridges located at Ghurmi and carrying the Udayapur-Okhaldhunga road over the Sunkoshi River and at Khurkot carrying the Sindhuli-Manthali road over the Sunkoshi River. Work has also halted on a bridge in West Nepal carrying the Chnichu-Jajarkot road over the Bheri River, on the Tawa River bridge, the Siwai bridge, the Tadi bridge at Nuwakot and on the bridge over the Junga River at Dhanusa.

A bridge expert in Nepal says that due to geological conditions in Nepal, pier construction faces problems. The expert suggests that bridges with piers should be avoided in the country and that arched structures, though more expensive to build, are more suitable for the country's rugged terrain and would offer long term cost benefits through reduced maintenance needs.

Pier problems at the Bheri Bridge have resulted in it being replaced by a suspension bridge and this has been suggested as another suitable bridge design solution for the country. The issue is endemic, with the country's geology and geography playing a key role. Bridge scour is a serious problem in Nepal, due to the country's mountainous terrain, deep rock valleys and fast flowing rivers. 2664 Nepal's Department of Roads has issue a notice that a further seven bridges are in a serious condition and require repairs.

Bridges requiring repair are at Mugling carrying the Prithvi Highway, the Marsyangdi Bridge carrying the Aanbukhaireni-Gorkha road, the Seti bridge carrying the Khaireni-Bhimad road, the Jharahi bridge carrying the Mahendra highway and the Kaligandaki bridge carrying the Siddhartha highway. The other structures are the Bheri bridge carrying the Ratna highway, the Tamakoshi bridge carrying the Lamosanghu road, the Sunkoshi bridge carrying the Lamosanghu - Jiri road and the Tadi bridge carrying the Pasanglamhu road.

For more information on companies in this article

Related Content

  • Rebuild project for historic Pennsylvania bridge
    September 10, 2015
    Rebuilding work is planned for a historic bridge in the US state of Pennsylvania to ensure it remains able to carry current traffic volumes. The work is being managed by consulting engineer Michael Baker International. Pennsylvania Department of Transportation (PennDOT) selected Michael Baker International for the US$5 million engineering and design project that will focus on the western spans of the Market Street Bridge in Harrisburg. Rehabilitating this critical traffic artery in Pennsylvania's capital re
  • New road reduces Carlisle congestion by 20%
    May 11, 2012
    Carlisle, in north-west England, has seen as 20% reduction in congestion since the opening of the city’s US$284million (£176m) Northern Development Route in February this year. Around 10,000 vehicles a day are using the new road, which is broadly in line with the predictions made by highways engineers when building a case to construct a new route connecting the A595 with the M6 around the western flank of the city. Traffic counters positioned on the new road show an average of 9,583 vehicles a day along the
  • Russian roads and bridges being planned
    April 22, 2020
    Russian road and bridge construction and maintenance works are being planned.
  • Nepal’s earthquake devastation revealed
    April 30, 2015
    Reports from Nepal highlight the devastation the country has suffered due to its recent massive earthquake. Measuring an enormous 7.8 on the Richter scale, the quake has demolished many buildings in capital Kathmandu, as well as damaging roads and other infrastructure. This was followed by a series of aftershocks, one of which measured 6.7 on the Richter scale. World Highways correspondent Ram Krishna Wagle reports that with many road links to other towns severely damaged, this is hampering the relief eff