Skip to main content

The Nepalese authorities are now addressing structural problems on a series of important bridge links in the country

Major structural problems have been identified in several bridges in Nepal.
March 1, 2012 Read time: 2 mins
Major structural problems have been identified in several bridges in Nepal. Construction work on seven large bridges in Nepal has been halted due to the problems arising in the pier construction.

Work has been stopped on bridges located at Ghurmi and carrying the Udayapur-Okhaldhunga road over the Sunkoshi River and at Khurkot carrying the Sindhuli-Manthali road over the Sunkoshi River. Work has also halted on a bridge in West Nepal carrying the Chnichu-Jajarkot road over the Bheri River, on the Tawa River bridge, the Siwai bridge, the Tadi bridge at Nuwakot and on the bridge over the Junga River at Dhanusa.

A bridge expert in Nepal says that due to geological conditions in Nepal, pier construction faces problems. The expert suggests that bridges with piers should be avoided in the country and that arched structures, though more expensive to build, are more suitable for the country's rugged terrain and would offer long term cost benefits through reduced maintenance needs.

Pier problems at the Bheri Bridge have resulted in it being replaced by a suspension bridge and this has been suggested as another suitable bridge design solution for the country. The issue is endemic, with the country's geology and geography playing a key role. Bridge scour is a serious problem in Nepal, due to the country's mountainous terrain, deep rock valleys and fast flowing rivers. 2664 Nepal's Department of Roads has issue a notice that a further seven bridges are in a serious condition and require repairs.

Bridges requiring repair are at Mugling carrying the Prithvi Highway, the Marsyangdi Bridge carrying the Aanbukhaireni-Gorkha road, the Seti bridge carrying the Khaireni-Bhimad road, the Jharahi bridge carrying the Mahendra highway and the Kaligandaki bridge carrying the Siddhartha highway. The other structures are the Bheri bridge carrying the Ratna highway, the Tamakoshi bridge carrying the Lamosanghu road, the Sunkoshi bridge carrying the Lamosanghu - Jiri road and the Tadi bridge carrying the Pasanglamhu road.

For more information on companies in this article

Related Content

  • Nepal plans road transport development
    May 17, 2016
    The Nepalese Government is planning a major programme of road development for the next three years. The aim of the programme is to build new roads that will join up to 500 Village Development Committee (VDC) locations that are not linked at present to the road network. According to the guidelines of the Ministry of Local Development, the Department of Local Infrastructure Development (DoLIDAR) has set a target to connect every VDC in Nepal with motorable roads. This is no small challenge however as Nepal is
  • Nepalese ring road nears completion
    February 27, 2012
    The Nepalese Government is building a 42km long ring road in eastern Nepal at Biratnagar.
  • Nepal's bridge issues
    February 23, 2012
    Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened.
  • Alberta’s peaceful partnership
    May 4, 2020
    A bridge project in northern Canada threw up some unexpected challenges, reports David Arminas, from the banks of the Peace River in Alberta