Skip to main content

Nepal highway subsidence problem causing traffic disturbance

Subsidence on a key stretch of highway in Nepal is causing major traffic disturbance. The BP Highway, also known as the Banepa- Sindhuli- Bardibas Road, has suffered subsidence on the Nepalthok-Khurkot stretch. The collapsed section measures 27m long and is causing delays for drivers. This Highway is an important route as it connets Nepal’s capital Kathmandu with Eastern Terai. Vehicles have been diverted to an alternative route, although part of the roadway is still being used to carry traffic in one d
March 11, 2017 Read time: 2 mins
A stretch of Nepal’s BP Highway has collapsed
Subsidence on a key stretch of highway in Nepal is causing major traffic disturbance. The BP Highway, also known as the Banepa- Sindhuli- Bardibas Road, has suffered subsidence on the Nepalthok-Khurkot stretch. The collapsed section measures 27m long and is causing delays for drivers. This Highway is an important route as it connets Nepal’s capital Kathmandu with Eastern Terai.

Vehicles have been diverted to an alternative route, although part of the roadway is still being used to carry traffic in one direction. Work to construct this stretch of road was completed in July 2015 in four phases. Funding for the work came from a Japanese grant worth US$210 million.

With Japanese Aid, the road now measures 158km and runs from Dhulikhel in Kavre District  to Bardibas in Mohottari district. The route carries around 1,600 vehicles/day.

Cracks that can be seen on the road were caused by the recent earthquake. Following the appearance of the cracks restrictions were placed on the route that only vehicles with a maximum weight of 10tonnes were allowed to use the road. However heavier vehicles continued to use the road, resulting in the collapse.

Reports suggest that the local administration, traffic police and the Department of road did not block heavy vehicles from using the road. This is only the highway in Nepal for which advanced technologies have been used in construction. The Nepalese Government is now planning to investigate the road failure.

Related Content

  • Nepal's highway plans
    March 22, 2012
    The Nepalese Government is working on plans to build a series of highways that will improve north-south connectivity for this mountainous country.
  • Nepal road tunnel work commencing
    October 25, 2019
    Construction work is commencing on the Nepal First Tunnel Road project.
  • PPRS Nice 2018: maintenance moves mountains
    June 22, 2018
    Strategic maintenance was a major theme at the second Pavement Preservation and Recycling Summit in Nice, France. The world is changing, mobility is changing and so roads must change and adapt for the future.” With this brief statement, Jacques Tavernier opened the second PPRS Summit. “At the same time there is a growing awareness of poor or non-existent maintenance for highways. The question for this conference is how to adapt road maintenance in the face of this challenge,” said Tavernier, in his role as
  • Nepal plans road transport development
    May 17, 2016
    The Nepalese Government is planning a major programme of road development for the next three years. The aim of the programme is to build new roads that will join up to 500 Village Development Committee (VDC) locations that are not linked at present to the road network. According to the guidelines of the Ministry of Local Development, the Department of Local Infrastructure Development (DoLIDAR) has set a target to connect every VDC in Nepal with motorable roads. This is no small challenge however as Nepal is