Skip to main content

Nepal bridge closes due to defect

The bridge spanning the Bijaypur River in Nepal has been closed to traffic due to serious structural problems. The bridge forms part of the Prithvi Highway and connects Bijaypur with Chauthe. Major cracks have been detected in structural members of the 74m-long steel girder bridge, which was erected in 2011. The bridge carries around 6,000 vehicles/day and repairs to the link are expected to take at least one month to complete. The local Road Division office is erecting a temporary structure upstream of the
March 14, 2019 Read time: 1 min
The steel bridge spanning the Bijaypur River in Nepal has had to be closed for repairs

The bridge spanning the Bijaypur River in Nepal has been closed to traffic due to serious structural problems. The bridge forms part of the Prithvi Highway and connects Bijaypur with Chauthe. Major cracks have been detected in structural
members of the 74m-long steel girder bridge, which was erected in 2011. The bridge carries around 6,000 vehicles/day and repairs to the link are expected to take at least one month to complete. The local Road Division office is erecting
a temporary structure upstream of the damaged bridge, while a study team has been formed to assess the situation and provide a long term solution.

Related Content

  • Russia's new road link
    April 20, 2012
    Plans are in hand in Russia for a new bridge spanning the Kuban River in Krasnodar. The 300m bridge will carry four lanes of traffic when it is complete over the Kuban River. The design work for the bridge is expected to be complete in spring 2013. The new bridge will help reduce congestion as the current Yablonovsky Bridge features just two lanes. It was designed to handle 6,000 vehicles/day but is instead carrying up to 30,000 vehicles/day.
  • US$73 million Francis Scott Bridge replacement contract
    September 3, 2024
    Kiewit has been awarded a US$73 million Francis Scott Bridge replacement contract.
  • $1.9 billion for Oregon-Washington bridge replacement
    May 20, 2025
    A further $1.9 billion is needed for the Oregon-Washington bridge replacement.
  • Sunderland’s Northern Spire bridge opens
    August 28, 2018
    Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather. The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project. Work began in May 2015 and the bridge has been built within its allocated €129 million budget. However, poor weather conditions pushed back the opening of the bridge from this past