Skip to main content

Nepal bridge closes due to defect

The bridge spanning the Bijaypur River in Nepal has been closed to traffic due to serious structural problems. The bridge forms part of the Prithvi Highway and connects Bijaypur with Chauthe. Major cracks have been detected in structural members of the 74m-long steel girder bridge, which was erected in 2011. The bridge carries around 6,000 vehicles/day and repairs to the link are expected to take at least one month to complete. The local Road Division office is erecting a temporary structure upstream of the
March 14, 2019 Read time: 1 min
The steel bridge spanning the Bijaypur River in Nepal has had to be closed for repairs

The bridge spanning the Bijaypur River in Nepal has been closed to traffic due to serious structural problems. The bridge forms part of the Prithvi Highway and connects Bijaypur with Chauthe. Major cracks have been detected in structural
members of the 74m-long steel girder bridge, which was erected in 2011. The bridge carries around 6,000 vehicles/day and repairs to the link are expected to take at least one month to complete. The local Road Division office is erecting
a temporary structure upstream of the damaged bridge, while a study team has been formed to assess the situation and provide a long term solution.

Related Content

  • Sunderland’s sliding bridge slips across the Wear
    October 26, 2016
    Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation next year likely. The project to build the New Wear Crossing is now half way through with the first half of the steel deck bridge poised mid-river. Completion of the bridge is expected in the spring of 2018. This month, hydraulic jack
  • The Cebu–Cordova Link Expressway
    September 19, 2021
    The 8.5km CCLEx, as it is known, will include the longest and tallest bridge in the Philippines when the structure is finished next year
  • BC ramps up Highway 1, Trans-Canada, repairs
    October 19, 2022
    The Canadian province has been working hard to repair major washouts along Highway 1 – the Trans-Canada Highway – since severe flooding last November.
  • Peri’s formwork and shoring solution for the “East End Crossing”
    July 6, 2016
    Pylons almost 90m high are a striking feature of a new cable-stayed East End Crossing bridge over the Ohio River in Louisville, Kentucky state in the US The pylons are characterised by their complex shapes and massive legs and cross beams. Peri provided a comprehensive overall concept for its construction – consisting of a planning solution with perfectly matched formwork, climbing, shoring and scaffolding systems along with extensive on-site support. With a Peri solution, the construction crew were a