Skip to main content

Nepal bridge closes due to defect

The bridge spanning the Bijaypur River in Nepal has been closed to traffic due to serious structural problems. The bridge forms part of the Prithvi Highway and connects Bijaypur with Chauthe. Major cracks have been detected in structural members of the 74m-long steel girder bridge, which was erected in 2011. The bridge carries around 6,000 vehicles/day and repairs to the link are expected to take at least one month to complete. The local Road Division office is erecting a temporary structure upstream of the
March 14, 2019 Read time: 1 min
The steel bridge spanning the Bijaypur River in Nepal has had to be closed for repairs

The bridge spanning the Bijaypur River in Nepal has been closed to traffic due to serious structural problems. The bridge forms part of the Prithvi Highway and connects Bijaypur with Chauthe. Major cracks have been detected in structural
members of the 74m-long steel girder bridge, which was erected in 2011. The bridge carries around 6,000 vehicles/day and repairs to the link are expected to take at least one month to complete. The local Road Division office is erecting
a temporary structure upstream of the damaged bridge, while a study team has been formed to assess the situation and provide a long term solution.

Related Content

  • STRABAG wins contract for Hamburg, Germany
    August 26, 2020
    STRABAG has won a major highway contract in Hamburg, Germany.
  • Italian highway bridge and tunnel link
    February 21, 2022
    A major Italian highway bridge and tunnel link is under construction.
  • Russia's road map ahead
    March 5, 2012
    Overall, Russia is to benefit from a major highway investment programme. The Federal Transport Development Programme will feature a budget of $21.5 billion for the 2010-2015 period. Some $15.1 billion is to be allocated for highway construction and repairs. Russian city St Petersburg and the surrounding the Leningrad region will see the start of major investment in infrastructure during 2011. The road sector will benefit strongly, with projects underway including the southern section of the Western High Spe
  • Developments in minimising construction defects
    February 27, 2012
    Egis has an innovative approach to addressing construction defects - *Martin O’Flaherty, Jean Pohu. Defects often become apparent after construction projects are handed over to the client and this is a common problem across most highway projects. The problem is shared by highway operators who have assumed the responsibility of managing such projects.