Skip to main content

Nairobi expressway construction now underway

Construction work has now commenced on the new expressway route through Kenya’s congested capital, Nairobi. The project has been delayed for nearly a decade but building of the link is now going ahead, an important move in reducing traffic jams in the city. The route will have two traffic lanes in either direction and will feature 10 interchanges, with a considerable portion of the expressway being elevated. It will provide an important connection between the A109 Nairobi to Mombasa route and A104 Nairobi
October 25, 2019 Read time: 2 mins

Construction work has now commenced on the new expressway route through Kenya’s congested capital, Nairobi. The project has been delayed for nearly a decade but building of the  link is now going ahead, an important move in reducing traffic jams in the city. The route will have two traffic lanes in either direction and will feature 10 interchanges, with a considerable portion of the expressway being elevated. It will provide an important connection between the A109 Nairobi to Mombasa route and A104 Nairobi to Malaba route. This will allow through traffic to use the expressway rather than having to pass through the city’s chronic congestion. Construction is being carried out by the Chinese contractor China Road and Bridge Corporation (CRBC) under the PPP model. An important feature of the new expressway will be the dedicated bus rapid transit (BRT) facilities, which will also help to improve public transport for the city.

Related Content

  • Kenyan capital’s key connection construction contract cost climbs
    February 27, 2018
    The project to build the new highway link from Kenya’s capital Nairobi to the city’s Jomo Kenyatta International Airport (JKIA) is now expected to cost US$579 million. This represents an increase of around $206 million from the pricetag originally expected for the link. This cost increase comes despite a substantial change in the design, with the route now featuring a series of flyover sections and underpasses, instead of being elevated along its 43.5km length as originally proposed. This redesign will
  • Restart ahead for Nairobi-Mombasa toll road
    May 16, 2025
    Full feasibility study for the US$3.5bn Nairobi to Mombasa toll road is handed over to Kenya National Highways Authority
  • Nairobi’s new public transport project
    September 11, 2020
    Nairobi’s new public transport project will see special bus lanes being built.
  • New junction designs for Nairobi to cut congestion
    June 30, 2014
    New junctions could cut chronic congestion in Kenyan capital Nairobi – Shem Oirere reports Kenya plans to replace all T-junctions in the country’s capital Nairobi with acceleration and deceleration lanes to address a crippling vehicle traffic regime estimated to consume $580,000 daily. “We will replace the junctions with acceleration and deceleration lanes,” said John Mosonik, the principal secretary in Kenya’s ministry of transport. He said the acceleration lanes, which allow cars joining the main road t