Skip to main content

Myanmar-Thailand bridge link on track

The new bridge that will connect Myanmar with Thailand is expected to open to traffic in 2019. The link will be called the second Friendship Bridge and will provide a connection from Mae Sot district in Thailand’s Tak province with the town of Myawaddy in Myanmar. The new bridge will form part of the Mae-Sot Bypass Road. The link will run from Highway No 12, cross the Moei/Thaungyin River at Ban Wang Takien in Mae-Sot district to link with Myawaddy. The bridge is intended to help boost, trade and tourism be
April 10, 2017 Read time: 2 mins
The new bridge that will connect Myanmar with Thailand is expected to open to traffic in 2019. The link will be called the second Friendship Bridge and will provide a connection from Mae Sot district in Thailand’s Tak province with the town of Myawaddy in Myanmar. The new bridge will form part of the Mae-Sot Bypass Road. The link will run from Highway No 12, cross the Moei/Thaungyin River at Ban Wang Takien in Mae-Sot district to link with Myawaddy. The bridge is intended to help boost, trade and tourism between the two countries and to reduce delays over the existing bridge, which becomes congested at peak periods. The plans have yet to be finalised however, while a feasibility study has yet to be carried out. In all the project is expected to cost in the order of US$113 million.

Related Content

  • Construction materials and road design in East Africa
    June 25, 2013
    An envisaged shortage in the supply of angular rock or crushed stone in Tanzania and a determination to conserve the environment by Kenyan authorities dictated the engineering design of a multi-national road linking the two largest economies in Eastern Africa. Shem Oirere reports The cost of buying crushed stone or hiring a site for mining the material and the expenses of moving it from the crushing site to the project area, saw designers opt for an intermediate alignment and discarding of the inner and out
  • Alberta eyes La Crete Ferry replacement
    September 2, 2020
    The Canadian province is considering a toll bridge over the Peace River.
  • Thailand’s new bridge project proposal
    August 19, 2020
    A new bridge project is being proposed for Thailand.
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s