Skip to main content

Myanmar bridge on track

Work is said to be progressing on track in Myanmar (Burma) on the Ayeyawady Bridge (Pakokku) project.
February 13, 2012 Read time: 1 min
Work is said to be progressing on track in Myanmar (Burma) on the Ayeyawady Bridge (Pakokku) project. Some 79% of the work has now been completed. When the structure is ready for use it will be the country's biggest bridge. The bridge will feature two lanes of vehicle traffic and will also have a rail connection. The main structure of the bridge will be 3.5km long.

Related Content

  • New bridge under construction in Turkey
    March 28, 2014
    Work is underway on a new bridge structure in Turkey, with tower cranes playing a key role in the project The two Potain tower cranes are being used to build a 610m long cable-stayed bridge in the south-east of the country. The two cranes are MC235B models and are working 10 hours/day on the project, which is taking 30 months. The new bridge will provide an important connection across the Ataturk Dam Reservoir on the Euphrates River.
  • China opens record-breaking bridge
    April 11, 2012
    China has opened the world's longest bridge over water, the 41.58km Jiaozhou Bay Bridge, which is said to have cost well over US$2 billion to build. It links the eastern port city of Qingdao to Huangdao Island across Jiaozhou Bay and is 4km longer than the previous longest bridge over water, the Lake Pontchartrain Causeway in Louisiana, USA. Opened in June, 2011 after four years of construction, the link is expected to carry some 30,000 vehicle/day and will reduce travel time by 30 minutes, although it is o
  • Montreal’s Champlain Bridge opens but late and over-budget
    June 27, 2019
    Montreal’s US$3.5-billion, 3.4km-long Samuel de Champlain Bridge has opened after four years of construction and months of delays, according to Canadian media reports. Work is continuing on the cycle and pedestrian paths and eventually a light-rail train will run down the middle of the six lane bridge over the St. Lawrence River. The new structure has a life-span of 125 years and runs alongside its namesake Champlain Bridge, a steel truss cantilever that opened in 1962 which will be demolished. Accord
  • Work underway on Texas highway upgrades
    August 25, 2020
    Work is well underway on key Texas highway upgrade projects.