Skip to main content

Myanmar bridge on track

Work is said to be progressing on track in Myanmar (Burma) on the Ayeyawady Bridge (Pakokku) project.
February 13, 2012 Read time: 1 min
Work is said to be progressing on track in Myanmar (Burma) on the Ayeyawady Bridge (Pakokku) project. Some 79% of the work has now been completed. When the structure is ready for use it will be the country's biggest bridge. The bridge will feature two lanes of vehicle traffic and will also have a rail connection. The main structure of the bridge will be 3.5km long.

Related Content

  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    September 19, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering* Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s p
  • Major highway bridge project planned for Dubai
    July 21, 2014
    Bidding is commencing for a major new highway bridge project in Dubai. The Al Ittihad bridge project is for a 2.7km link, spanning the Dubai Creek. Dubai's Roads and Transport Authority (RTA) is inviting contractors to prequalify for the project, with the tender due to be issued in October 2014. The schedule calls for construction work to commence October 2014 and for the new structure to be open to traffic in early 2018. The 2.7km long bridge will feature a 420m long main creek section, carrying 12 lanes o
  • Parsons wins bridge deal in Arkansas
    January 17, 2017
    Parsons is heading the project to build the I-40 White River Bridge and approaches in the US state of Arkansas. The contract is to build a 1.92km bridge for the Arkansas State Highway and Transportation Department and Parsons is leading the joint venture that also includes CJ Mahan construction. The new bridge will be constructed some 61m upstream from the existing structure. The existing White River Bridge has four 3.66m-wide lanes and 61m of vertical clearance between piers for commercial navigation
  • Explosive demolition works for US Bridge
    January 19, 2015
    A successful explosive demolition project for an old bridge has been carried out in the US state of Missouri. The Fairfax Bridge was constructed in 1935 and was no longer able to meet current transportation needs. Some 760m long the bridge was carrying around 6,000 vehicles/day. Another bridge was also opened nearby, the Platte Purchase Bridge, in 1957 to help the original structure carry the necessary traffic volumes. Removing the old structure of the Fairfax Bridge as well as the Platte Purchase Bridge and replacing them with a new bridge is costing around US$79 million.