Skip to main content

Myanmar bridge on track

Work is said to be progressing on track in Myanmar (Burma) on the Ayeyawady Bridge (Pakokku) project.
February 13, 2012 Read time: 1 min
Work is said to be progressing on track in Myanmar (Burma) on the Ayeyawady Bridge (Pakokku) project. Some 79% of the work has now been completed. When the structure is ready for use it will be the country's biggest bridge. The bridge will feature two lanes of vehicle traffic and will also have a rail connection. The main structure of the bridge will be 3.5km long.

Related Content

  • Sri Lanka's new highway - on track
    February 14, 2012
    Work is progressing on-track on Sri Lanka's Southern Expressway project. This will be the country's first expressway and is expected to be completed by 2012, removing the bulk of traffic from the existing coastal road that is highly congested and also has serious safety issues.
  • Guatemala’s new bridge will cut traffic delays
    November 22, 2023
    Guatemala’s new bridge will cut congestion and traffic delays.
  • Delay for tender for link roads to Istanbul’s new Bosporus bridge
    June 25, 2015
    The tender process for the road connections to the third bridge over the Bosporus in Turkey has been delayed once more. This is the third time the tender for the connecting roads for Istanbul's third bridge over the Bosporus has been postponed. The tender for the North Marmara Motorway was originally set for 6th March 2015 but was then pushed back to the 6th May. It was then announced that the tender would be run in two stages, with the Kinali-Odayeri motorway tender on 7th July and the Kurtkoy-Akyazi motor
  • Race track construction in Japan
    March 13, 2024

    Road construction machines from the Wirtgen Group have been used to build a new race track in Japan. Four Vögele asphalt pavers worked on the project to build a demanding circuit in a mountainous area in Japan.

    Tight corners and uphill gradients of up to 19% are features of the private racing circuit. Three Vögele pavers, a SUPER 1800-3i, a SUPER 1803-3i and a SUPER 1900-2, paved almost 100,000m2 in four layers, while a MT 3000-3i offset material feeder was also used to ensure efficiency and quality.