Skip to main content

Moscow’s road infrastructure timetable to 2016

According to plans for Moscow road infrastructure, issued by the Department of Construction, 215km of roads, 78 artificial structures and around 150 pedestrian underpasses should be reconstructed and built in Russia’s capital by 2016. Around 87.3km of road surface will be renovated and 11 artificial structures will be built on 11 major highways. Another 30.5km of roads and eight artificial structures will open as a part of a new road network project for the development of Skolkovo innovation centre. A fu
August 23, 2013 Read time: 2 mins
According to plans for Moscow road infrastructure, issued by the Department of Construction, 215km of roads, 78 artificial structures and around 150 pedestrian underpasses should be reconstructed and built in Russia’s capital by 2016.

Around 87.3km of road surface will be renovated and 11 artificial structures will be built on 11 major highways. Another 30.5km of roads and eight artificial structures will open as a part of a new road network project for the development of Skolkovo innovation centre. A further 27.6km of roads and 26 structures will be built under the development of the North-West chord. Additionally, 18 road bridges are to be raised and 11 road junctions renovated on the crossroads of outbound routes and the Moscow Ring Road.

Meanwhile, reconstruction of several highways (Yaroslavskoe, Varshavskoe, Kashirskoe, and Balaklavsky prospect/Rublevskoe) will be finished before the end of 2013. Road junctions on Dmitrovskoe highway, Profsoyuznaya street and the crossroad of Podolskikh Kursantov street and the Moscow Ring Road are already delivered.

Related Content

  • Moscow road plan calls for new links
    May 29, 2018
    Moscow will benefit from an additional 100km of roads being added to the city’s network during 2018. This road expansion should help address the chronic congestion problems in Russia’s capital city. The work will include the opening of much of the city’s new North-Western and North-Eastern Chords. This is expected to increase traffic capacity by as much as 30% in the city’s urban areas. Other important links scheduled to open include an overpass for the Rublevskoe highway and a stretch of the Kiyevskoye to
  • New Moscow’s massive motorway building and road maintenance programme
    February 5, 2015
    A huge programme of works is planned for New Moscow. This is aimed at adding extra capacity. The plan calls for the building or reconstruction of over 120km of roads within the next four years. About 600km of roads will be built in the Troitsky and Novomoskovsky (New Moscow) administrative districts by 2035. Most of the new roads will be built with four lanes, allowing two in either direction. The Central Ring Road is a priority project. A road between the Kommunarka village and the Yuzhnoe Butovo district
  • Major road plans are being set for Russia’s two key cities
    May 14, 2012
    Targets are being set for road investment, construction and repairs in Russia. To meet the country’s infrastructure needs, Russia’s National Association of Builders estimates that some 1,500km of roads must be built/year. Meanwhile the highway authorities in Moscow are aiming to repair around 33% of the city’s road surface every year. Some 23.6 million m2 of road surface will be repaired in Moscow during 2012, compared with 24.7 million m2 in 2011.
  • Moscow’s new road, bridge and tunnel links
    February 25, 2022
    Moscow is to benefit from new road, bridge and tunnel links.