Skip to main content

Moscow’s road infrastructure timetable to 2016

According to plans for Moscow road infrastructure, issued by the Department of Construction, 215km of roads, 78 artificial structures and around 150 pedestrian underpasses should be reconstructed and built in Russia’s capital by 2016. Around 87.3km of road surface will be renovated and 11 artificial structures will be built on 11 major highways. Another 30.5km of roads and eight artificial structures will open as a part of a new road network project for the development of Skolkovo innovation centre. A fu
August 23, 2013 Read time: 2 mins
According to plans for Moscow road infrastructure, issued by the Department of Construction, 215km of roads, 78 artificial structures and around 150 pedestrian underpasses should be reconstructed and built in Russia’s capital by 2016.

Around 87.3km of road surface will be renovated and 11 artificial structures will be built on 11 major highways. Another 30.5km of roads and eight artificial structures will open as a part of a new road network project for the development of Skolkovo innovation centre. A further 27.6km of roads and 26 structures will be built under the development of the North-West chord. Additionally, 18 road bridges are to be raised and 11 road junctions renovated on the crossroads of outbound routes and the Moscow Ring Road.

Meanwhile, reconstruction of several highways (Yaroslavskoe, Varshavskoe, Kashirskoe, and Balaklavsky prospect/Rublevskoe) will be finished before the end of 2013. Road junctions on Dmitrovskoe highway, Profsoyuznaya street and the crossroad of Podolskikh Kursantov street and the Moscow Ring Road are already delivered.

Related Content

  • $303 million Lowell bridge replacement
    June 12, 2025
    Skanska is handling the $303 million Lowell bridge replacement in the US
  • New highway works planned for India
    February 10, 2025
    Major new highway works are planned for India.
  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.