Skip to main content

Moscow road and tunnel tendering

The tender process is opening for a tunnel section as well as linking roads for a project in Moscow. The project will form part of the Stolbovo transport hub. The tunnel will measure 1,.47km long, while the project includes building 7km of roads in Moscow’s Troitsky and Novomoskovsky Administrative Districts (TNAD) in the south west of the city. Also included in the work will be a 2670km overpass section as well as utilities and the construction phase has to be completed within a 17 month period.
June 11, 2018 Read time: 1 min

The tender process is opening for a tunnel section as well as linking roads for a project in Moscow. The project will form part of the Stolbovo transport hub. The tunnel will measure 1,.47km long, while the project includes building 7km of roads in Moscow’s Troitsky and Novomoskovsky Administrative Districts (TNAD) in the south west of the city. Also included in the work will be a 2670km overpass section as well as utilities and the construction phase has to be completed within a 17 month period.

Related Content

  • Tender cancelled for fifth section of Moscow’s central ring road
    December 15, 2014
    Russia’s Federal Antimonopoly Service has cancelled the results of a tender for construction and maintenance of the fifth section of the central ring road in the Moscow. The FAS made the announcement following an investigation based on a complaint from Stroygazconsulting, one of Russia’s largest infrastructure construction companies. The 23-year contract was awarded to the Koltsevaya Magistral. Stroygazconsulting complained that the bids for the contract, worth nearly US$752 million, were not evaluate
  • Alberta to twin last 215km of Highway 3
    December 6, 2022
    Request for proposals are going ahead for twinning several more sections of Highway 3, a major commercial and trucking route that runs across the western Canadian province.
  • Russia's key highway development project
    February 8, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports
  • Russia's key highway development project
    May 28, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports. Daytime temperatures top 30°C in September, and with hundreds of shops and hotels, it is not difficult to see why Sochi has become Russia's premier holiday playground. The city, on the east coast of the Black Sea, near the border with Georgia, bustles with tourists, and this is boosted with delegates at the 9th International Investment Forum Sochi 2010.